2760
|
Thursday, January 30, 2025, 07:13 |
David Wang | Crane | Standard Operation | | | inspection of target module lifting frames ITA0494-1997-01 and ITA1994-1997-02 | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02
yesterday. He certified the use of these |
|
2761
|
Thursday, January 30, 2025, 07:17 |
David Wang | Crane | Standard Operation | | | inspection of target hall crane below hook attachment pins and plates ITA6550-01. | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01
yesterday. He certified the use of these |
|
2762
|
Monday, February 03, 2025, 13:04 |
David Wang | Safe Module Parking | Maintenance | | | ITW/ITW 24VDC electrical connectors for TP BVs MRO. | ITW/ITW 24VDC electrical connectors for
TP BVs MRO has been done. |
|
2763
|
Monday, February 03, 2025, 13:10 |
David Wang | Cooling | Standard Operation | | | HALCW pump ITC:MP1 has been started. | HALCW pump ITC:MP1 has been started. water
are supplied to both ITE and ITW system.
all water signals for individual circuits |
|
2764
|
Tuesday, February 04, 2025, 11:50 |
Alexander Shkuratoff | ITW | Standard Operation | | | ITW HV bias test without module (Work permit I2025-02-03-2) | Tuesday, February 04, 2025, 10:15
Started voltage ramp up.
Using 250 V increments.
Tuesday, |
|
2765
|
Wednesday, February 05, 2025, 13:46 |
Alexander Shkuratoff | ITE | Standard Operation | | | ITE HV bias test without module (Work permit I2025-02-03-2) | Wednesday, February 05, 2025, 12:20
Ed has the voltage already
up to 1000 V. Starting further ramp up in |
|
2768
|
Friday, February 14, 2025, 10:43 |
David Wang | ITW/ITE | Standard Operation | | | target pit CAD filter replacement in TH. | Plant Group Gabril.T organized a target
pit CAD filter replacement and testing yesterday.
My group helped on this job. small |
|