2608
|
Wednesday, June 12, 2024, 10:18 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 is moved from TCS to silo this morning | TM2 is moved from TCS to silo this morning.
The move is smooth. |
|
|
2609
|
Thursday, June 13, 2024, 11:44 |
David Wang | Conditioning Station | Repair | TM2 | | Replaced several o ring seals on TM2 service cap. | couple of E-8 to low E-7 atm.cc/sec
leak were found on TM2 service cap top air
to vacuum o rings. Replaced these |
|
|
2614
|
Monday, June 17, 2024, 07:36 |
David Wang | ITE | Repair | | | IG1S elbow oring seal and a blabk off cap oring seal beside the elbow were replaced on ITE entrance module top.. | IG1S elbow o ring seal and a blank off
cap o-ring seal beside the elbow were replaced
on ITE entrance module top last Friday. IG1s |
|
|
2616
|
Tuesday, June 18, 2024, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | Tm3 electrical check without target. | Tm3 electrical check without target is
done. Everything is good including 2 x 5
pin connectors( all OL at 250 V to 60 KV |
|
|
2617
|
Tuesday, June 18, 2024, 15:04 |
Adam Newsome | Spent Target Vault | Maintenance | | | Annual Inspection of Main and Mini Storage Vaults | The annual inspection of the main storage
vault will be skipped this year since extensive
inspection and testing was performed during |
|
|
2618
|
Tuesday, June 18, 2024, 15:16 |
Adam Newsome | Crane | Maintenance | | | Pail Handling Tool - Annual Inspection | The pail handling tool which is used to
move 5 gallon pails around the target hall
was inspected by A. Newsome. The main tool |
|
|
2619
|
Wednesday, June 19, 2024, 08:10 |
David Wang | Waste Package/Ship | Development | | | 5 gallon spent target pail, spent target lifting long pole and hook assembly load test | 5 gallon spent target pail, lifting
long pole and hook assembly load test was
done by Rupan, Keyur ,and David. Load |
|
|
2620
|
Wednesday, June 19, 2024, 14:11 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | TM3 has been moved from SHC to TCS. | TM3 has been moved from SHC to TCS.The
move is smooth. |
|
|
2626
|
Wednesday, June 26, 2024, 13:49 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Tm2 has been moved from SW silo to TCS. | Tm2 has been successfully moved from SW
silo to TCS. |
|
|
2628
|
Tuesday, July 02, 2024, 11:38 |
Frank Song | ITE/ITW/Storage Area | Standard Operation | | | shielding blocks transfer | 5 shielding blocks have been moved
from ITW to ITE, MAA area has been secured. |
|
|
2629
|
Wednesday, July 03, 2024, 14:01 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Tm2 has been moved from TCS to SW silo. | Tm2 has been moved from TCS to SW silo.
the move is smooth. |
|
|
2634
|
Friday, July 05, 2024, 14:13 |
Adam Newsome | Waste Package/Ship | Standard Operation | | | F-308 flask loading - five flasks loaded | Today (2024-07-05), five flasks were loaded
in preparation for shipment with the following
targets: SiC#43 (Pail 272), SiC#44 (Pail |
|
|
2636
|
Tuesday, July 09, 2024, 16:14 |
Carla Babcock | ITE | Repair | | | Attempts to reduce ITE:EL trips from HV sparks | ITE:EL has been tripping off due to HV
sparks. Usually this also trips ITE:Q1/2.
These are sitting in side-by-side racks. |
8x |
|
2637
|
Wednesday, July 10, 2024, 09:55 |
Adam Newsome | Safe Module Parking | Maintenance | | | Annual electrical and mechanical inspection of Safe Module Parking | An annual electrical and mechanical inspection
was performed on the SMP today by Adam
Newsome, Travis Cave, Riley Sykes, Maico |
|
|
2638
|
Wednesday, July 10, 2024, 10:44 |
Riley Sykes | South Hot-Cell | Maintenance | | | Spring idler install | New spring idlers were installed
onto rotational chain drive for SHC roof.
Operation ran smoothly in both directions |
|
|
2639
|
Friday, July 12, 2024, 08:51 |
Riley Sykes | Safe Module Parking | Maintenance | | | SMP chain guard | SS washers were added to all slotted
holes on SMP chainguard cover plate |
|
|
2643
|
Wednesday, July 17, 2024, 15:06 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround Complete - SHC/NHC Area | A safety walkaround for July 2024 was completed
for the B2 level by A. Newsome. No deficiencies
to report. |
|
|
2645
|
Wednesday, July 24, 2024, 10:10 |
Frank Song | ITE/ITW/Storage Area | Standard Operation | | | shielding blocks transfer | 5 shielding blocks have been transferred
from ITE to ITW. MAA is secured again after
moving. |
|
|
2673
|
Thursday, September 05, 2024, 12:50 |
Adam Newsome | Crane | Maintenance | | | Overhead crane: up/down hoist delayed start issue | D. Wang reports that recently the overhead
crane has been exhibiting a delayed start
(approx. 1 min) when operating in local mode. |
|
|
2679
|
Wednesday, September 11, 2024, 13:38 |
Adam Newsome | North Hot-Cell | Repair | | | Spare Manipulator - Y-axis motion not functioning | Update 2024-09-12:
C. Fisher confirms this is actually normal
behaviour. The Y-axis motion is inhibited |
|