ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  2546   Friday, February 16, 2024, 10:57 Adam NewsomeSpent Target VaultStandard Operation  F-308 flask loading - three flasks loadedToday (2024-02-16), three flasks were loaded
in preparation for  shipment with the following
targets: UCx#39, UCx#41 and C#3.
 Target_Index_2024-02-16.xlsm 
  2551   Friday, March 15, 2024, 10:04 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - SHC to NE SiloTM3 was moved from SHC to NE silo. Cable
tray was recently installed. 
  
  2617   Tuesday, June 18, 2024, 15:04 Adam NewsomeSpent Target VaultMaintenance   Annual Inspection of Main and Mini Storage Vaults The annual inspection of the main storage
vault will be skipped this year since extensive
inspection and testing was performed during
 PXL_20240618_213819000.jpgPXL_20240618_213905146.jpg 
  2618   Tuesday, June 18, 2024, 15:16 Adam NewsomeCraneMaintenance  Pail Handling Tool - Annual InspectionThe pail handling tool which is used to
move 5 gallon pails around  the target hall
was inspected by A. Newsome.  The main tool
 PXL_20240618_213742257.jpgPXL_20240618_213455575.jpgPXL_20240618_213626154.jpg 
  2634   Friday, July 05, 2024, 14:13 Adam NewsomeWaste Package/ShipStandard Operation   F-308 flask loading - five flasks loaded Today (2024-07-05), five flasks were loaded
in preparation for  shipment with the following
targets: SiC#43 (Pail 272), SiC#44 (Pail
 Target_Index_2024-07-05.xlsm 
  2637   Wednesday, July 10, 2024, 09:55 Adam NewsomeSafe Module ParkingMaintenance   Annual electrical and mechanical inspection of Safe Module Parking An annual electrical and mechanical inspection
was performed on the   SMP today by Adam
Newsome, Travis Cave, Riley Sykes, Maico
 PXL_20240710_160636341.jpgPXL_20240710_160506424.jpg 
  2643   Wednesday, July 17, 2024, 15:06 Adam NewsomeFacilitiesStandard Operation  Safety Walkaround Complete - SHC/NHC AreaA safety walkaround for July 2024 was completed
for the B2 level by A. Newsome. No deficiencies
to report.
  
  2673   Thursday, September 05, 2024, 12:50 Adam NewsomeCraneMaintenance  Overhead crane: up/down hoist delayed start issueD. Wang reports that recently the overhead
crane has been exhibiting a delayed start
(approx. 1 min) when operating in local mode.
  
  2679   Wednesday, September 11, 2024, 13:38 Adam NewsomeNorth Hot-CellRepair  Spare Manipulator - Y-axis motion not functioningUpdate 2024-09-12:
C. Fisher confirms this is actually normal
behaviour. The Y-axis motion is inhibited
  
  2680   Thursday, September 12, 2024, 14:12 Adam NewsomeWaste Package/ShipDevelopment SiC#44Failed waste emplacement at CNL: Flask #22, Pail 275 (SiC#44)On 2024-09-12, CNL reported difficulty
with lowering Pail 275 from F-308 flask #22
into their tile hole. The four other pails
 Report_on_Inspection_of_Pail_275_on_2024-10-03.pdf 
  2704   Thursday, October 10, 2024, 12:20 Adam NewsomeFacilitiesStandard Operation  Safety Walkaround complete - ISAC Hot Cells, Target HallA safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas. 
The resulting spreadsheet can be
  
  2720   Monday, November 25, 2024, 09:56 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 move - silo to SHCTM3 was moved from silo to SHC with no
target. Move successful. 
  
  2722   Tuesday, November 26, 2024, 13:54 Adam NewsomeConditioning StationStandard OperationTM3 TM3 move - SHC to TCSTM3 was moved from SHC to TCS with UCx#47.
The move was smooth. 
  
  2726   Tuesday, December 03, 2024, 10:51 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 move - ITE to SHCTM2 was moved from ITE to SHC with Ta#68
target. During the move, a railing was lightly
bumped by the corner of the module - no obvious
  
  2727   Tuesday, December 03, 2024, 12:28 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM3 move - TCS to ITETM3 was moved with UCx#47 from TCS to ITE.
The move was smooth. 
  
  2731   Wednesday, December 04, 2024, 10:40 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 move - SHC to siloTM2 was remotely moved from the South Hot
Cell to SW Silo. Reading at SHC = 89.8 mSv/h.
The move was smooth. 
  
  2734   Thursday, December 05, 2024, 12:00 Adam NewsomeSpent Target VaultStandard Operation Ta#68Spent target move - Ta#68 in Pail 300Ta#68 spent target was moved in Pail 300
to storage vault location 5A. The dose rate
measured at the South Hot Cell was 429 mSv/h
 Storage_Vault_Contents_2024-12-05.pdf 
  2736   Wednesday, December 18, 2024, 12:18 Adam NewsomeSpent Target VaultStandard Operation  Five Pails Transferred from Main Vault to Mini VaultFive pails were transferred from main vault
to mini vault. Note that there was already
one pail in the mini vault, so at present
 MiniVault_2024-12-18.pdf 
  2737   Wednesday, December 18, 2024, 14:17 Adam NewsomePail Handling ToolMaintenance  Pail Handling Tool - InspectionAn informal inspection of the main Pail
Handling Tool was performed today as the
final one for the year. Note that the main
 ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf 
  2738   Friday, January 03, 2025, 09:59 Adam NewsomeFacilitiesStandard Operation  Safety Walkaround complete - ISAC Hot Cells, Target HallA safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be
  