Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2278     Entry time: Friday, November 26, 2021, 10:52
Author: Adam Newsome 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: UC#35 
Subject: Spent Target Move 

The spent UC#35 target has been moved from the south hot cell to the spent target vault. It was placed in pail #264 and put in spot 6A of the vault. See attached PDF for more details.

Attachment 1: Target_Index_2021-11-26.pdf  429 kB  | Show | Hide all
ELOG V2.9.2-2455