  2608   Wednesday, June 12, 2024, 10:18 David WangConditioning StationStandard OperationTM2 TM2 is moved from TCS to silo this morningTM2 is moved from TCS to silo this morning.
The move is smooth. 
  
  2609   Thursday, June 13, 2024, 11:44 David WangConditioning StationRepairTM2 Replaced several o ring seals on TM2 service cap.  couple of E-8 to low E-7 atm.cc/sec
leak were found on TM2 service cap top air
to vacuum  o rings.  Replaced these
  
  2614   Monday, June 17, 2024, 07:36 David WangITERepair  IG1S elbow oring seal and a blabk off cap oring seal beside the elbow were replaced on ITE entrance module top..IG1S elbow o ring seal and a blank off
cap o-ring seal beside the elbow were replaced
on ITE entrance module top last Friday. IG1s
  
  2616   Tuesday, June 18, 2024, 11:59 David WangSouth Hot-CellStandard OperationTM3 Tm3 electrical check without target.Tm3 electrical check without target is
done. Everything is good including 2 x 5
pin connectors( all OL at 250 V to 60 KV
 TM3_without_target_2024_june_18.pdf 
  2617   Tuesday, June 18, 2024, 15:04 Adam NewsomeSpent Target VaultMaintenance   Annual Inspection of Main and Mini Storage Vaults The annual inspection of the main storage
vault will be skipped this year since extensive
inspection and testing was performed during
 PXL_20240618_213819000.jpgPXL_20240618_213905146.jpg 
  2618   Tuesday, June 18, 2024, 15:16 Adam NewsomeCraneMaintenance  Pail Handling Tool - Annual InspectionThe pail handling tool which is used to
move 5 gallon pails around  the target hall
was inspected by A. Newsome.  The main tool
 PXL_20240618_213742257.jpgPXL_20240618_213455575.jpgPXL_20240618_213626154.jpg 
  2619   Wednesday, June 19, 2024, 08:10 David WangWaste Package/ShipDevelopment   5 gallon spent target pail, spent target lifting long pole and hook assembly load test 5 gallon spent target pail, lifting
long pole and hook assembly load test was
done by Rupan, Keyur ,and David.  Load
  
  2620   Wednesday, June 19, 2024, 14:11 David WangSouth Hot-CellStandard OperationTM3 TM3 has been moved from SHC to TCS.TM3 has been moved  from SHC to TCS.The
move is smooth. 
  
  2626   Wednesday, June 26, 2024, 13:49 David WangConditioning StationStandard OperationTM2 Tm2 has been moved from SW silo to TCS.Tm2 has been successfully moved from SW
silo to TCS. 
  
  2628   Tuesday, July 02, 2024, 11:38 Frank SongITE/ITW/Storage AreaStandard Operation  shielding blocks transfer 5 shielding blocks have been moved
from ITW to ITE, MAA area has been secured.
  
  2629   Wednesday, July 03, 2024, 14:01 David WangConditioning StationStandard OperationTM2 Tm2 has been moved from TCS to SW silo.Tm2 has been moved from TCS to SW silo.
the move is smooth.
  
  2634   Friday, July 05, 2024, 14:13 Adam NewsomeWaste Package/ShipStandard Operation   F-308 flask loading - five flasks loaded Today (2024-07-05), five flasks were loaded
in preparation for  shipment with the following
targets: SiC#43 (Pail 272), SiC#44 (Pail
 Target_Index_2024-07-05.xlsm 
  2636   Tuesday, July 09, 2024, 16:14 Carla BabcockITERepair  Attempts to reduce ITE:EL trips from HV sparksITE:EL has been tripping off due to HV
sparks. Usually this also trips ITE:Q1/2.
These are sitting in side-by-side racks.
 8x 
  2637   Wednesday, July 10, 2024, 09:55 Adam NewsomeSafe Module ParkingMaintenance   Annual electrical and mechanical inspection of Safe Module Parking An annual electrical and mechanical inspection
was performed on the   SMP today by Adam
Newsome, Travis Cave, Riley Sykes, Maico
 PXL_20240710_160636341.jpgPXL_20240710_160506424.jpg 
  2638   Wednesday, July 10, 2024, 10:44 Riley SykesSouth Hot-CellMaintenance  Spring idler install New spring idlers were installed
onto rotational chain drive for SHC roof.
Operation ran smoothly in both directions
 Image.jfifImage_(2).jfif 
  2639   Friday, July 12, 2024, 08:51 Riley SykesSafe Module ParkingMaintenance  SMP chain guard SS washers were added to all slotted
holes on SMP chainguard cover plate
  
  2643   Wednesday, July 17, 2024, 15:06 Adam NewsomeFacilitiesStandard Operation  Safety Walkaround Complete - SHC/NHC AreaA safety walkaround for July 2024 was completed
for the B2 level by A. Newsome. No deficiencies
to report.
  
  2645   Wednesday, July 24, 2024, 10:10 Frank SongITE/ITW/Storage AreaStandard Operation  shielding blocks transfer 5 shielding blocks have been transferred
from ITE to ITW. MAA is secured again after
moving.
  
  2673   Thursday, September 05, 2024, 12:50 Adam NewsomeCraneMaintenance  Overhead crane: up/down hoist delayed start issueD. Wang reports that recently the overhead
crane has been exhibiting a delayed start
(approx. 1 min) when operating in local mode.
  
  2679   Wednesday, September 11, 2024, 13:38 Adam NewsomeNorth Hot-CellRepair  Spare Manipulator - Y-axis motion not functioningUpdate 2024-09-12:
C. Fisher confirms this is actually normal
behaviour. The Y-axis motion is inhibited
  