Tuesday, October 25, 2011, 11:58, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#26 High Powered, Module move
|
TM#4 with SiC#26 HP has been moved from the south hot cell to the conditioning station. |
Tuesday, October 25, 2011, 08:47, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#26 High Powered, Electrical check
|
TM#4 with SiC#26 HP has been checked electrically it has passed. It was noted that the Megger check of the Oven to Chassis (earth ground) and Oven to
60kV Common is low but will not hinder running, according to Don Jackson. Also yesterday the transition piece that sits on the 55 pin connector was
damaged from excessive handling, it was removed and repaired and it now back in place. |
Wednesday, October 05, 2011, 09:41, Travis Cave, Spent Target Vault, Standard Operation, , UCx#2, Spent target move
|
The spent UCx #2 target has been moved into storage. It was placed in tray 5A and is in Pail #91, it was 8.91mSv/hr upon removal from the south hot cell.
There are 5 free slots left in the storage vault. |
Tuesday, October 04, 2011, 14:13, Travis Cave, ITW, Standard Operation, TM1, TaC#1, Move ot TM#1
|
Move of TM#1 with the TaC#1 target has been moved from the south hot cell to the west target station. |
Monday, October 03, 2011, 14:52, Travis Cave, South Hot-Cell, Standard Operation, TM1, TaC#1, Electrical check
|
TM#1 with TaC#1 installed passed the electrical test. With a value of 882MOhms that was meggered from the heat shield to the chassis, all other measurements
are within spec. |
Monday, October 03, 2011, 11:54, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#2 - TaC#1, Target change UCx#2-TaC#1
|
UCx#2 has been removed from Tm1 and put in a bucket with a slow argon feed and a lid placed lossely on top.
TaC#1 ITW has been installed and is awaiting testing at the cell. |
Monday, October 03, 2011, 11:00, Travis Cave, ITW, Standard Operation, TM1, UCx#2, Move from west station to south hot cell
|
TM#1 with UCx#2 has been moved from the west station to the south hot cell. Move went well. |
Thursday, September 29, 2011, 11:11, Travis Cave, Spent Target Vault, Standard Operation, , Ta#36, Spent target move
|
The spent Ta#36 has been moved to the storage vault. It was placed in pail #90, and placed into slot 3B, it was 111mSv/hr upon removal from the south
hot cell. There are 6 free slots left in the storage vault. |
Wednesday, September 28, 2011, 11:59, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, TM#4 moved from South Hot Cell to to North East Silo.
|
TM#4 moved from South Hot Cell to to North East Silo, move went well. |
Wednesday, September 28, 2011, 10:06, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#36, Ta#36 Removal
|
Ta#36 was removed from target module 4.
The standard, unexplained, un-investegated, un-resolved "arc" were again present on "JP's connector", otherwise no apparent
problems visible. |
Wednesday, September 28, 2011, 09:07, Travis Cave, ITE, Standard Operation, TM4, Ta#36, Move of TM#4 from East target station to south hot cell.
|
Move of TM#4 with Ta#36 from East target station to south hot cell, move went well. |
Wednesday, September 14, 2011, 10:32, Travis Cave, Spent Target Vault, Standard Operation, , Ta#37, Spent target move
|
Ta#37 has been moved from the south hot cell into the storage vault. The target is in pail #89 and in spot 6A in the vault. It was 840uSv/hr upon removal
from the south hot cell. There are 7 free spots left in the vault. |
Thursday, September 01, 2011, 09:11, Don Jackson, ITW, Standard Operation, TM1, UCx#2, Argon Venting West Station
|
West target station is setup to use argon for tank venting. There is 1200 PSI remaining on argon bottle in electrical room. That is sufficent
for venting west target station to atmosphere twice. ISAC Operations has been previousily contacted and their procedures for venting remain the same
except that they can not rely on ITW:CG4S to determine when at atmospheric pressure. I have asked them to contact me if an unscheduled vent is required. |
Wednesday, August 24, 2011, 17:11, Bevan Moss, Conditioning Station, Standard Operation, TM1, UCx#2, Leak Check, HV conditioning and Module Move
|
Today a leak check on TM1's external seals and the heat shield line was completed by David Wang. After 16 hours of the turbo pumps running on the conditioning
station stations pressures were 3.6 x 10^-6 T, 1.2 x 10^-5 T, and 1.8 x 10^-6 T for the containment box, secondary vacuum, and service cap respectively.
This is a significantly quicker pump down after the cross with small turbo pump was installed on the vacuum vessel. The base pressure of the leak testing |
Wednesday, August 24, 2011, 16:35, Bevan Moss, South Hot-Cell, Repair, TM1, UCx#2, Move, inspection and repair
|
On August 22nd TM1 was vented with Argon in the conditioning station. It had been pumping with just the roughing pump over the weekend so the UCx#2
target would not be exposed to oxygen. The move went without incident and took roughly an hour to complete. Once at the hot cell the panel was removed
by Tom Lyth and a leak check completed with Bevan, David Wong, Grant Minor, and Tom Lyth present. The connections to source tray were checked starting |
Friday, August 19, 2011, 14:52, Bevan Moss, Conditioning Station, Repair, TM1, UCx#2, Leak Check
|
A leak check was performed on the module when it was in the conditioning station today. There were no external leaks
found. When the coolant lines were check a small leak was found in the heat shield circuit. Base leak rate was 6.7 x 10^-9 atm cc /sec and rose to 4.1
x 10^-9 atm cc /sec quickly (~3 seconds) and remained there for the 2 minute test. The remaining lines |
Thursday, August 18, 2011, 16:07, Bevan Moss, Conditioning Station, Standard Operation, TM1, UCx#2, Pump Down
|
Pump down in the conditioning station started at ~2:40 for rough down. The turbo pumps were turned on at ~3:30 and at 3:52 the pressures were reading
as follows:
IMG in the containment box 9.2 x 10^-5 T |
Thursday, August 18, 2011, 14:09, Bevan Moss, South Hot-Cell, Standard Operation, TM1, UCx#2, Leak and Electrical Check plus Remote Move to Conditioning Station
|
TM1 with UC#2 had the target installed, the heat shield line was pumped on and achieved a vacuum of 0.0 x 10^-4 Torr and a leak rate of 0.0
x 10^-9 atm cc / sec with no response when sprayed with helium. An electrical check was completed by David and myself all values were withing tolerance.
The module was then moved from the south hot cell to the conditioning station where it will start pump down. The move was uneventful every operated |
Thursday, August 18, 2011, 13:12, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx #2, UCx #2 Installation
|
UCx #2 has been installed onto TM1.
Installation went well except the left leg got bent slightly sometime between testing on the jig and installation onto the module (probably
during removal for the argon filled bag). Leg was gentle offered into place and its clearance with the heat shield double checked with both a mirror |
Wednesday, August 17, 2011, 13:09, Bevan Moss, ITW, Standard Operation, TM1, Ta #37, TM1 move from ITW to Hot Cell
|
TM1 with Ta #37 target was moved from ITW to the south hot cell. The rotation of TM1 may have been off slightly during the final removal from ITW
but it was minimal. Entry into the south hot cell went with out incident. This was my first time moving the module without the presence of Travis Cave. |
|