1804
|
Wednesday, October 10, 2018, 10:50 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#57 | Electrical Check | The various electrical check done
on TM#4 after the UC run and before the start
of the Ta run. |
  |
1810
|
Friday, October 26, 2018, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | | | Exit Module moved | The west exit #2 module has been moved from
the south hot cell to the conditioning station. |
|
1811
|
Monday, October 29, 2018, 10:43 |
David Wang | Conditioning Station | Repair | | | ITW exit 2 leak check at TCS. | I did a leak check this morning on exit
2 module at TCS. LD base leak rate
is 4.00XE-9atm.cc/sec, Base pressure is 0.00 |
|
1813
|
Wednesday, October 31, 2018, 14:20 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#25 | Module move | TM#2 with UC#25 has been moved from the south
hot cell to the conditioning station. |
|
1815
|
Thursday, November 01, 2018, 11:42 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx 25. | TM2 HS line helium pressure test at TCS and helium spray at SHC.. | Chad and I did leak check on TM2
HS line at SHC yesterday. Base LR 0.0XE-9
atm.cc/sec. No response on LD. |
|
1817
|
Monday, November 05, 2018, 14:27 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | UC#25 | Target module disconnected | Frank and Anders disconnected the water
and electrical connections this afternoon
after the target was conditioned over the |
|
1829
|
Wednesday, November 28, 2018, 06:39 |
David Wang | Conditioning Station | Standard Operation | | | Disconnection checklist LpTa #56 | TM4 was disconnected in ITE. Checklist
list in attachment. |
|
1832
|
Wednesday, November 28, 2018, 13:38 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#26 | Module move | TM#4 with UC#26 has been moved from
the south hot cell to the conditioning station. |
|
1842
|
Wednesday, December 19, 2018, 14:41 |
Anders Mjos | Conditioning Station | Standard Operation | | No target | Installed Shield Block on TCS | Frank and Anders installed lid on TCS and
started vacuum system yesterday. To run over
the Holidays. Retrieved dose badge from operational |
|
1843
|
Wednesday, January 02, 2019, 10:26 |
Anders Mjos | Conditioning Station | Standard Operation | | | Restarrted TP1S | Found pumps off after the holidays. Restarted
roughing pump and TP1S |
|
1849
|
Wednesday, January 09, 2019, 06:26 |
David Wang | Conditioning Station | Standard Operation | | | TCS vacuum pumps have been stopped. | The tCS will be vented soon for TM2 move
later this week. |
|
1853
|
Thursday, January 10, 2019, 09:26 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the south
hot cell to the conditioning station. |
|
1854
|
Thursday, January 10, 2019, 10:45 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 is under vacum at TCS. | TCS: TP1, TP2 and TP1S are started. |
|
1856
|
Friday, January 11, 2019, 13:17 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS and TM2 vacuum system are switched off for this Sunday power outage. | I will restart all pumps Monday morning.
|
|
1858
|
Monday, January 14, 2019, 07:07 |
David Wang | Conditioning Station | Maintenance | TM2 | | Restarted TCS vacuum system . | No issue. |
|
1863
|
Monday, January 28, 2019, 10:41 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 water lines helium pressure test at TCS | leak detector base LR: 0.0Xe-9atm.cc/sec.
helium 70 psi. test time : 3 minutes for
each circuit.The results in atm.cc/sec are |
|
1866
|
Thursday, February 14, 2019, 07:13 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS vacuum pumps have been stopped. | Preparation on TM2 move from TCS to SHC. |
|
1877
|
Tuesday, February 26, 2019, 10:33 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module move | TM#2 with no source tray has been
moved from the south hot cell to the conditioning
station. |
|
1878
|
Friday, March 01, 2019, 08:42 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | | Conditioning TM2 without source tray | BIAS and EZL connected. No water flowing
into the module (water looped on top of module)
Friday, March 01, 2019, 08:20: 10kV |
 |
1881
|
Tuesday, March 05, 2019, 07:20 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 HV test at TCS | Spark between HV cover vertical mesh plate
and HS 60KV bias connecting clamp 90degree
angle at 55 KV on TM2 top. HV cover is removed |
|