Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1717     Entry time: Friday, May 18, 2018, 09:34
Author: David Wang 
Category: Conditioning Station 
Type: Repair 
Module: TM4 
Target/Number:  
Subject: water leak on TM4 Tube heater - B line confirmed. 

At 8:50 AM today, I applied water to TM4 tube heater - (B) line at TCS. All high vacuum gauges got response on this action. Water is leaking through B line on TM4.

It should be D line . David 2018-06-05

Attachment 1: TM4_2018-05-18_Water_Leak.docx  166 kB  Uploaded Friday, May 18, 2018, 18:08
ELOG V2.9.2-2455