ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  327   Tuesday, April 30, 2013, 07:51 chad fisherSouth Hot-CellRepairTM3 Coil line flow checkDavid and I checked circuits p and q (the
water cooled coil ciruit) for flow this morning
as, with the source tray still in the module,
  
  996   Wednesday, July 15, 2015, 09:44 chad fisherSouth Hot-CellRepairTM2 Coil Line replacementwater block jig installed, module side
sealing surfaces re-polished and cleaned.
Coil line inserted into the hot cell and
 TM2_20150715_093157.jpgTM2_20150715_094745.jpg 
  506   Thursday, October 17, 2013, 10:24 chad fisherSouth Hot-CellRepairTM4 Coil Line RemovalThe containment box was removed from TM4
earlier this morning in preparation for removal
of the C2 circuit water lines, their
 TM4_C2_circuit.pdf 
  991   Friday, July 10, 2015, 09:33 chad fisherSouth Hot-CellRepairTM2 Coil Line DeconCoil line has been in RPG's ultrasonic
decon over night. Initial swipes this morning
picked up 5000 counts. It has been decontaminated
  
  1822   Thursday, November 22, 2018, 08:52 Anders MjosITEStandard OperationTM4Ta#57Closed ITE dump waterPaddle wheel signal was tripping proton
beam in ITW. Valved off ITE dump to divert
flow to ITW. Field around valve was about
  
  2471   Thursday, August 03, 2023, 12:24 Jason ZhangCraneDevelopment  Cleanup of camera installation on target hall crane, installation of replacement laser The cleanup of
the ISAC Target Hall crane and installation
 LaserProgramCalibrationLocation.pngSICK_Laser_Upgrade_Calibration.xlsxInstallation_IMG.png 
  818   Monday, December 08, 2014, 15:22 Anders MjosConditioning StationDevelopmentTM2 Circuit D water testMonday, December 08, 2014, 14:00: Dan M
and Anders connected the water supply to
circuit D and installed the module cover.
 TCS_Heater_Transmission_Power.xlsxCircuit_D_test_results_for_TM2_status_meeting_2014-12-11.pdfHeated_water_leak_test_plan.pdfHeated_water_leak_test_Circuit_D_RESULTS.docx 
  605   Monday, February 24, 2014, 11:05 chad fisherSouth Hot-CellRepairTM2 Circuit D blank offThe blank off with the o-ring has been
removed, manipulator fixed, circuit D water
block sealinhg surfaces cleaned and blank
  
  766   Thursday, October 16, 2014, 15:40 Anders MjosConditioning StationMaintenance  Chiller unitNOTE: If there is a problem with
the chiller unit (ie Fault 1 or Fault 2),
a power cycle may reset the VFDs for the
 TCS_Cooling_System.pdf 
  1090   Monday, October 05, 2015, 10:19 Anders MjosConditioning StationMaintenance  Chiller maintenance will be performed Tuesday October
6th
Tuesday, October 06, 2015: Maintenance
  
  2218   Tuesday, May 25, 2021, 16:20 Anders MjosConditioning StationMaintenance  Chiller maintenanceA contractor on site today for chiller
maintenance. CP2 and CP3 circuit is leaking
and shall not be used. CP1 can still be used.
  
  359   Thursday, May 23, 2013, 14:07 Bevan MossConditioning StationRepair  Chiller Unit Repaired ESC came today and "repaired"
the chiller. There was something wrong with
the VFD controller. The were able to get
  
  317   Tuesday, April 23, 2013, 16:11 Bevan MossConditioning StationMaintenanceTM3N/AChiller Fault 2 During Testing it was noticed that
Fault 2 was indicated and one of the compressors
would not run. Fault 2 does not indicate
  
  1958   Tuesday, August 06, 2019, 01:13 Carla BabcockConditioning StationRepairTM4Dummy HP SIS targetChecks on EE line leak fix and window line leak (not fixed)TM4 has developed 4 leaks so far:

    Line B - seems to be solved
with an indium gasket (some testing already
  
  1631   Thursday, September 28, 2017, 15:34 Anders MjosConditioning StationDevelopmentTM2 Changes to MP3 startup Due to problems with the regulating
valve WPV1, the VFD (Variable Frequency Drive)
for the pump has been programmed to do a
  
  1576   Wednesday, July 05, 2017, 11:18 Anders MjosConditioning StationMaintenanceTM4Ta#52Changed electrical configuration to cathode bias John Chow configured TCS to cathode
bias mode (IRH1538). The anode P/S is in
positive mode.
  
  71   Monday, January 16, 2012, 09:30 David WangITEMaintenance  Changed all old inducion coils for flow sensors in ITEI had changed all old induction coils for
flow sensors in ITE .I checked all ITE water
signals on control boards in electrical room.They
  
  1862   Thursday, January 24, 2019, 10:34 David WangITWMaintenance  Changed 24VDC plugs of TP solenoid valves in ITW3 damaged 24VDC plugs of TP solenoid valves
are replaced. Inspected other plugs. All
of them are in good condition now. 
  
  215   Wednesday, November 14, 2012, 11:04 David WangITERepairTM4 Change ITE dump water circiut flow wheelI changed ITE dump water circuit flow wheel
due to its poor performance. The new flow
wheel works fine. The signal on electrical
  
  2368   Wednesday, September 28, 2022, 12:58 Matthew GareauNorth Hot-CellRepair  Chad repaired the right operator side manipulatorOn 26/Sept/2022
Chad disassembled the right operator
side manipulator, and noticed that gears
 IMG_20220926_091024~2.jpgIMG_20220926_091040.jpgIMG_20220926_091047.jpgIMG_20220926_091153.jpg 