Tuesday, November 22, 2022, 14:53, Carla Babcock, North Hot-Cell, Maintenance, TM4, , Multipin connector alignment pin on TM4 module loose
Friday, December 16, 2022, 16:35, Adam Newsome, Spent Target Vault, Standard Operation, , , Pails measured, moved to mini-storage vault
Friday, December 16, 2022, 16:39, Adam Newsome, Crane, Standard Operation, , , Crane powered off for holidays
Friday, January 06, 2023, 09:41, Adam Newsome, Spent Target Vault, Standard Operation, , , Pails moved to mini-storage vault
Friday, January 06, 2023, 10:38, David Wang, ITW, Standard Operation, TM2, , ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test.
Tuesday, January 24, 2023, 07:21, David Wang, ITW, Maintenance, , , ITW pit general clean up.
Tuesday, January 24, 2023, 07:26, David Wang, Conditioning Station, Standard Operation, , , TH floor moping and garbage collelctions.
Friday, January 27, 2023, 07:11, David Wang, Crane, Standard Operation, , , Target hall Crane annual inspection has beend done.
Friday, January 27, 2023, 07:15, David Wang, Crane, Standard Operation, , , Target hall Crane annual inspection has beend done.
Friday, January 27, 2023, 07:18, David Wang, Crane, Standard Operation, , , Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02
Friday, January 27, 2023, 07:25, David Wang, Crane, Standard Operation, , , Inspection of TH crane below hook attachment pins and plates ITA6550-01
Monday, February 13, 2023, 09:57, David Wang, ITW, Maintenance, , , ITW/ITE primary vacuum back up lines and BVs leak check in target pit.
Tuesday, February 14, 2023, 11:36, David Wang, Assembly/Bench Test, Repair, , , Turbo pump BVs o-ring replacement.
Wednesday, February 22, 2023, 09:22, Carla Babcock, ITE/ITW, Standard Operation, , , HV testing of ITE/ITW
Wednesday, March 01, 2023, 09:27, David Wang, Cooling, Maintenance, , , Two filters on HALCW resin circuit have been replaced.
Wednesday, March 01, 2023, 09:34, David Wang, Cooling, Maintenance, , , Visual inspection of HALCW for possible small water leak or drip.
Wednesday, March 01, 2023, 10:01, David Wang, ITE/ITW, Development, , , vacuum pit ventilation upgrade.
+
Monday, March 06, 2023, 11:31, Adam Newsome, North Hot-Cell, Repair, , , Spare Telemanipulator: Y-Motion Linear Actuator Repair
+
Tuesday, March 07, 2023, 10:37, chad fisher, North Hot-Cell, Repair, , , Spare Telemanipulator: Y-Motion Linear Actuator Repair
Wednesday, March 08, 2023, 06:32, David Wang, Cooling, Maintenance, , , HALCW flow sensors replacement.