1648
|
Thursday, October 19, 2017, 14:20 |
Anders Mjos | Assembly/Bench Test | Standard Operation | | | Source tray inspection | Two minor chips in the main 60 kV
insulators on the source tray was inspected
today by Anders, Tom and Aurelia. The chips |
|
1649
|
Thursday, October 19, 2017, 14:20 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | SiC#37 | SiC#37 Conditioning | Thursday, October 19, 2017, 14:20: EE configured
for conditioning. HV cage locked up
Thursday, October 19, 2017, 16:46: |
|
1652
|
Thursday, October 26, 2017, 09:56 |
Anders Mjos | ITE | Repair | TM4 | SiC#37 | Leak on multi pin connector feedthrough | On maintenance day Tuesday, the roughing
of the target station could not go below
1.5 Torr. A brief troubleshooting on Tuesday |
|
1655
|
Thursday, November 09, 2017, 08:46 |
Anders Mjos | Conditioning Station | Repair | | | Communication fiber replaced for HV PLC | After extensive troubleshooting the
communication fiber was found to be damaged
and has been replaced by Gelo. |
|
1658
|
Thursday, November 09, 2017, 10:39 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#55 | Conditioning Ta#55 | Thursday, November 09, 2017, 10:40: BIAS
/ EL to 30 / 15 kV. 400 uA on BIAS
Bias was stable for 1 hour. Handed |
|
1665
|
Wednesday, December 06, 2017, 09:33 |
Anders Mjos | Conditioning Station | Maintenance | | | Running chiller for maintenance tech | Dakine is on site to do maintenance
on the chiller. The tech requested the chiller
to operate. |
|
1666
|
Wednesday, December 13, 2017, 15:32 |
Anders Mjos | Assembly/Bench Test | Maintenance | TM2 | | Source Tray inspection | The Source tray was inspected in the RH
shop today by Anders, Friedhelm and Jens.
The routing of the lines are satisfactory, |
|
1668
|
Tuesday, December 19, 2017, 10:41 |
Anders Mjos | Crane | Maintenance | | | Crane powered down | The target hall crane has been powered
down by Don today in preparation for the
power shutdown over the Holidays. |
|
1669
|
Thursday, December 21, 2017, 15:11 |
Anders Mjos | Conditioning Station | Maintenance | | | Powered down devices | Powered down mechanical pumps in ISAC-I
Experimental hall, vacuum gauge and turbo
pump controllers in ISAC-I B2 North Hot Cell |
|
1670
|
Friday, December 22, 2017, 11:09 |
Anders Mjos | ITW | Standard Operation | TM2 | | Shut down High Active Cooling water | Stopped MP1 today in preparation for the
power outage over the holidays. both P-25
and P-26 breakers have been switched off |
|
1673
|
Tuesday, January 02, 2018, 14:47 |
Anders Mjos | Conditioning Station | Standard Operation | | | Pumping on secondary vacuum | Tuesday, January 02, 2018, 14:45: TP1S
started |
|
1674
|
Tuesday, January 02, 2018, 15:17 |
Anders Mjos | Conditioning Station | Maintenance | | | Tested chiller | Tested all 3 compressors and MP2 |
|
1675
|
Thursday, January 04, 2018, 13:28 |
Anders Mjos | Conditioning Station | Maintenance | | | Troubleshooting IG1S | TCS:IG1S is reporting vacuum levels that
seem to be too low (1E-10 to 1E-8 Torr).
The gauge was connected to the controller |
|
1677
|
Tuesday, January 16, 2018, 10:36 |
Anders Mjos | Spent Target Vault | Standard Operation | TM2 | | Old TM2 Source Tray moved to Cyclotron basement | The old TM2 Source Tray from 2009 has been
moved to Cyclotron basement this morning.
Source tray was stored in location 9. The |
|
1679
|
Wednesday, January 17, 2018, 10:38 |
Anders Mjos | Spent Target Vault | Standard Operation | TM1 | | Old TM1 Source Tray moved to Cyclotron basement | The old TM1 Source Tray from 2011 has been
moved to Cyclotron basement this morning.
Source tray was stored in location 10. The |
|
1685
|
Tuesday, February 13, 2018, 13:54 |
Anders Mjos | ITE | Standard Operation | TM4 | SiC#37 | Target module disconnected | TM disconnected by David and Yasmine Feb
8th |
|
1686
|
Tuesday, February 13, 2018, 13:56 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#55 | Target module disconnected | TM disconnected by David and Yasmine Feb
8th. One of the water couplings were leaking
for a short while when disconnected. NCR |
|
1687
|
Wednesday, February 14, 2018, 10:06 |
Anders Mjos | ITW | Maintenance | TM2 | | Replaced parker couplings on Window cooling line | By Anders & David. Couplings will be
taken apart for inspection. |
|
1688
|
Friday, February 16, 2018, 13:46 |
Anders Mjos | ITW | Maintenance | TM2 | | Parker coupling inspection | Findings and photos from the inspections
attached. The inspection was conducted by
Anders, David and Maico. |
|
1709
|
Thursday, May 03, 2018, 13:26 |
Anders Mjos | South Hot-Cell | Repair | TM4 | | EZL short troubleshooting | Yesterday Aaron, Isaac and Anders inspected
the EZL connection from the service chase
to the optics tray using the goose neck camera |
|