1572
|
Wednesday, June 28, 2017, 16:43 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | Ta#52 | Conditioning Ta#52 | NEW HV cable for BIAS installed earlier
this week.
Wednesday, June 28, 2017, 16:42: |
|
|
1574
|
Thursday, June 29, 2017, 11:55 |
David Wang | Conditioning Station | Repair | | | TCS HV cable and feed through installation | John Chow and I installed new TCS HV cable
and feed through with their mounting panel
back to TCS Faraday cage this Tuesday. ECO-4269 |
|
|
1576
|
Wednesday, July 05, 2017, 11:18 |
Anders Mjos | Conditioning Station | Maintenance | TM4 | Ta#52 | Changed electrical configuration to cathode bias | John Chow configured TCS to cathode
bias mode (IRH1538). The anode P/S is in
positive mode. |
|
|
1580
|
Monday, July 10, 2017, 10:19 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Turned off TCS water system | Prepare for TM4 move tomorrow morning. |
|
|
1582
|
Wednesday, July 12, 2017, 11:05 |
Anders Mjos | Conditioning Station | Maintenance | | | Testing of new high voltage cable | The target hall has been locked-out as
per Document-70039.
Forced IG1, IG1S and IG2 to switch |
|
|
1583
|
Thursday, July 13, 2017, 10:53 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the north
east silo to the conditioning station. |
|
|
1584
|
Monday, July 17, 2017, 16:28 |
Anders Mjos | Conditioning Station | Development | TM3 | No target | Conditioning TM3 | 50 kV stable with less than 1 spark/h during
the weekend by RIB obs.
Today 57 kV reached, but observed |
|
|
1585
|
Monday, July 17, 2017, 17:50 |
Aurelia Laxdal | Conditioning Station | Development | TM3 | No target | Conditioning TM3 |
|
|
|
1587
|
Tuesday, July 18, 2017, 16:53 |
Anders Mjos | Conditioning Station | Development | TM3 | No target | Conditioning TM3 | Conditioning continues today with resistors
removed from the HV cable
Tuesday, July 18, 2017, 16:53: BIAS |
|
|
1588
|
Monday, July 31, 2017, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved back to the NE
silo from the conditioning station. |
|
|
1594
|
Thursday, August 03, 2017, 17:08 |
Anders Mjos | Conditioning Station | Repair | TM2 | | Power bump | Thursday, August 03, 2017, 17:08:
Restarting vacuum and water system |
|
|
1601
|
Friday, August 25, 2017, 16:33 |
Anders Mjos | Conditioning Station | Repair | | | Testing HV after cooling line repair | The BIAS voltage was brought up to
70 kV today and held there for 1h. No sparking
observed. |
|
|
1604
|
Monday, August 28, 2017, 14:34 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#21 | Module move | TM#4 with UC#21 has been moved from
the south hot cell to the conditioning station. |
|
|
1606
|
Tuesday, August 29, 2017, 08:59 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 HS line leak checks | TM4 HS line leak checks are done, at SHC
and TCS. SHC: Helium spray. TCS: Helium
pressurize 70psi. LD base LR 0.0 X |
|
|
1607
|
Tuesday, August 29, 2017, 09:01 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been connnected at TCS. | TM4 has been connected at TCS. TCS water
system has been started for TM4. TM4 and
TCS vacuum pumping down is good so far. |
|
|
1609
|
Tuesday, September 05, 2017, 06:33 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Turned off TCS water system and vacuum system. | Argon vent and disconnect TM4 at TCS. |
|
|
1611
|
Friday, September 08, 2017, 11:20 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the north
east silo to the conditioning station. |
|
|
1612
|
Friday, September 08, 2017, 14:08 |
David Wang | Conditioning Station | Repair | TM3 | | TCS and TM3 | TM3 is located at TCS and it is pumping
down now. TCS water system has been started.
All TCS water lines for TM3 module internal |
|
|
1613
|
Wednesday, September 13, 2017, 10:05 |
David Wang | Conditioning Station | Repair | TM3 | | Switch off TCS water system and vacuums | Preparing vent the TCS/TM3. We will remove
TM3 service tray cover plate after
venting. |
|
|
1614
|
Wednesday, September 13, 2017, 16:05 |
David Wang | Conditioning Station | Repair | TM3 | | remove Tm3 service tray cover plate | TM3 service tray cover plate has been removed.
It is bagged and placed to TH b2 level south
wall beside the silo. |
|