Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1488
Entry time:
Tuesday, April 11, 2017, 14:06
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM4
Target/Number:
Subject:
SHC, TM2 leak check on HS line.
Chad and I did leak check on TM1 HS line at SHC. 0.0XE-9 atm.cc/sec. No leak.
ELOG V2.9.2-2455