Tuesday, September 18, 2012, 13:41, David Wang, South Hot-Cell, Standard Operation, TM1, Nb#7, leak check heat shield circuit
|
Chad and i did a leak check on TM1 heat shield circuit with new Nb#7 target installed. It took about 5 mins pump down the circuit to leak rate 0.0x
E-9atm.cc/sec and 0.0x E-4 torr on leak detector.
All vacuum lines and joints which connected to the leak detector had been helium sprayed and they are leak tight. Chad sprayed helium on |
Tuesday, September 18, 2012, 09:13, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move
|
TM#1 moved from the south west silo to the south hot cell, move went well. |
Friday, September 14, 2012, 10:45, Travis Cave, Spent Target Vault, Standard Operation, , UCx#4, Spent target move
|
UCx#4 has been moved from the south hot cell to the spent target vault. The target was placed in pail #99 and now resides in spot 3C of the vault. It
measured 55.3mSv/hr at ~1m from the hot cell. See attached PDF for further spent target vault details. |
Thursday, September 13, 2012, 13:27, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move
|
TM#1 has been moved from the south hot cell to the south west silo. Move went well. |
Thursday, September 13, 2012, 11:03, Travis Cave, South Hot-Cell, Standard Operation, TM1, UCx#4, module move
|
TM#1 with UCx#4 has been moved from the west target station to the south hot cell. Move went well. |
Wednesday, September 12, 2012, 11:59, David Wang, ITW, Standard Operation, TM1, UCx, TM1 disconnected in ITW
|
I removed 5 shielding blocks from ITW to block storage area, and disconnected TM1 in ITW. After UCx run, the radioactive level around the turbo
pumps and primary vacuum lines are pretty high. This affect the general field inside the ITW pit around working area.i took 15 minuts to finish the job
and i got 0.1msvr dose. the general field around my working area is about 350 usv/h. |
Wednesday, September 12, 2012, 07:00, David Wang, ITE, Standard Operation, TM4, NiO #1, ITM4 in ITE connected and pumping down
|
TM4 had been connected in ITE. Six turbo pump had been started . thepumpming diwn is very good so far. The water interlock check on ITE and TM4 had been
finished and everything is good.All water signals are strong and constant by visually checking. |
Friday, September 07, 2012, 10:37, Travis Cave, Conditioning Station, Standard Operation, TM4, NiO#1, Electrical check
|
Electrical check of the TM#4 with NiO#1 was done again today. see attached file for results. |
Friday, September 07, 2012, 09:47, Travis Cave, Spent Target Vault, Standard Operation, , UO#3, Spent target move
|
The spent UO#3 was moved from the south hot cell to the storage vault. It was in pail 98 and placed in spot 1A of the vault, the field measured upon
removal from the hot cell were 42mSv/hr. See attached PDF for vault details. |
Friday, September 07, 2012, 08:54, David Wang, Conditioning Station, Standard Operation, TM4, NiO #1, TM4 NiO #1 target heat shield helium pressure check is done.
|
leak detector pumped down to 0.0xE-9 atm.cc/sec, and 0.0xE-4 torr. All high vacuum gauge readings at CS and TM4 are at low -6 range from 2.2xE-6torr
to 4.2x E-6 torr. Applied 80 psi helium to heat shield circuit for 5minutes and there is no any response on leak detector. The heat shield circuit
is leak tight. |
Wednesday, September 05, 2012, 14:40, Travis Cave, Conditioning Station, Standard Operation, TM4, NiO#1, Electrical check
|
See attached PDF for details. 60kV Common to the target is low at 343k but I've been told will work. Test will be done again on Friday after it has sat
a few days under vacuum. |
Wednesday, September 05, 2012, 14:36, chad fisher, South Hot-Cell, Standard Operation, TM4, NiO #1, UOx removal NiO installation
|
UOx was removed from TM4 yesterday and NiO#1 installed.
Video was taken.
Main stand-off insulators continue to deteriorate. |
Wednesday, September 05, 2012, 11:55, Travis Cave, Conditioning Station, Standard Operation, TM4, NiO#1, module move
|
TM#4 with NiO#1 has been moved from the south hot cell to the conditioning station. Move went well. |
Tuesday, September 04, 2012, 14:34, David Wang, South Hot-Cell, Standard Operation, TM4, NiO #1, TM4 heat shield circuit leak check with NiO#1 target
|
Chad and i did a leak check on TM4 heat shield circuit with new NiO#1 target installed. It took about 40 mins(much longer than usual) to pump down the
circuit to leak rate 0.6x E-9atm.cc/sec and 0.0x E-4 torr o leak detector.
All vacuum lines and joints which connected to the leak detector had been helium sprayed and they are leak tight.Chad sprayed helium on each |
Tuesday, September 04, 2012, 11:11, Travis Cave, South Hot-Cell, Standard Operation, TM4, UO#3, module move
|
TM#4 with UO#3 has been moved from the east target station to the south hot cell for a target exchange. The move went well. |
Friday, August 31, 2012, 12:10, chad fisher, South Hot-Cell, Maintenance, , , Hot Cell Maitenance
|
Entered south hot cell Wednesday and replaced the pre-filter air filter as well as the front two light bulbs. Also removed two bags of compressible garbage,
one bag of metal, and of course the bagged air filter (as Joe M. expressed as interest in havung it).
Inital checks found approximately 4000 cpm on the cell side of the temporary Al. panel used during the cell entry, 2000 cpm on the tacky mats layed |
Thursday, August 30, 2012, 13:57, David Wang, ITE, Standard Operation, TM4, , Disconnected TM4 in ITE.
|
I disconnected TM 4 in ITE on AUG 29th morning.The vacuum lines stay untouched and they will be disconnected on SEP 04th. |
Thursday, August 23, 2012, 07:34, David Wang, ITW, Repair, , , Replaced broken air lines on ITW HARP5B cylinder.
|
Prob guys replaced broken air lines on ITW HARP 5B Cylinder.Several shielding blocks had been moved out to make the cylinder accessible. After the replacement,the
HARP5B works fine.All shield blocks had been moved back to original position. The job is done. |
Monday, August 20, 2012, 12:28, David Wang, ITW, Standard Operation, TM1, , I moved 5 shielding blocks from ITE to ITW,
|
I moved 5 shielding blocks from ITE to ITW.ITW is configured to take proton beam now. |
Tuesday, August 14, 2012, 14:27, David Wang, ITW, Standard Operation, TM1, UCx, TM1connection in ITW
|
Connected TM1 in ITW,started 6 turbo pumps, and finished TM1 water interlock check . Every thing is good so far. |
|