Entry  Tuesday, November 06, 2012, 11:34, chad fisher, South Hot-Cell, Standard Operation, TM1, , Nb#7 Removal IMG_0797[1].JPGIMG_0798[1].JPGIMG_0799[1].JPG

Attached are pre-removal pictures of NB#7 and the inside face of the containment box cover before cleaning.

Entry  Tuesday, November 06, 2012, 11:06, Travis Cave, ITW, Standard Operation, TM1, Nb#7, module move 

TM#1 with Nb#7 has been moved from the west target station to the south hot cell move went well.

Entry  Friday, November 02, 2012, 13:18, Travis Cave, Spent Target Vault, Standard Operation, , , spent target assay Vault_Storage_November_2_2012.pdf

This week six targets and the two source trays were assayed and surveyed from the storage vault. see attached PDF for details.

Entry  Friday, November 02, 2012, 08:45, maicodallavalle, Spent Target Vault, Maintenance, , , F-308 

The F-308 have been cleaned and serviced. There were three F-308's that came back with some contamination.#13, #15 and #19 were found to have contamination. They were decontaminated. All of the loose contamination was removed. There is still some fixed contamination. The levels of contamination are low enough to still be used for shipping spent targets. They have been moved to the north hot cell area and are ready for to be filled with spent targets. 

Entry  Wednesday, October 31, 2012, 11:24, David Wang, ITE, Standard Operation, TM4, , Transfer five shielding blocks from ITW to ITE. 

Bevan and I transferred five shielding blocks from ITW to ITE. ITE is ready for taking proton beam.

Entry  Wednesday, October 24, 2012, 11:53, Travis Cave, Spent Target Vault, Standard Operation, , NiO#1, Spent target move Vault_Storage_October_24_2012.pdf

The NiO #1 spent target was placed into storage today. It is in pail number 01 (101 on Vault Status page) and located in slot 4A of the vault. It was 35.5 mSv/hr upon removal from the south hot cell. See attached PDF for vault details.

Entry  Wednesday, October 24, 2012, 11:51, Travis Cave, ITE, Standard Operation, TM4, UCx#5, module moved 

Yesterday TM#4 with UCx#5 was moved to the east target station from the conditioning station,  move went well.

Entry  Tuesday, October 16, 2012, 07:14, David Wang, Conditioning Station, Standard Operation, TM4, UCX#5, TM4 heat shield helium pressure test and electrical check at CS 

TM4 heat shield helium pressure test and electrical check were done  at CS  last week. The results are good. NO leak had been found on heat shield circuit.The electrical check is also good.

Entry  Tuesday, October 09, 2012, 14:53, Bevan Moss, Conditioning Station, Development, TM4, UCx#5, Module Move 

TM4 was remote moved from the SCH to the TCS today. This was the first time the module was moved with the framework for the cage in place. The ion gauge on the service cap is closer to the cage than anticipated and as a result the pins for the gauge were sheared off. Discussion as to how to repair the gauge (both short term and long term needs to be had). We will try and rough down the TM tonight, it is not believed the vacuum will be affected.

Entry  Tuesday, October 09, 2012, 13:44, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#5, NiO#1 removal UCx#5 installation IMG_0780[1].JPG

NiO#1 was removed this morning.

UCx#5 was inserted into the hot cell around 1 pm, installed and leak checked and ready to go to the conditioning station 1:40pm

did have a little trouble with the 9 pin connector. It had to be lossened to get it to mate properly. It was le-tightened once the proper fit was achieved.

Entry  Tuesday, October 09, 2012, 11:17, Bevan Moss, ITE, Standard Operation, TM4, NiO#1, Module Move 

 TM4 with NiO#1 was moved from ITE to the SHC today. The move went well with no issues.

Entry  Tuesday, October 09, 2012, 10:35, David Wang, ITE, Standard Operation, TM4, NiO #1, Disconnected TM4 in ITE. 

I disconnected TM4 in ITE this morning. The heat shield circuit has been purged with air.

Entry  Thursday, October 04, 2012, 11:06, David Wang, Conditioning Station, Repair, , , Replace conditioning station scroll pump in target hall 

Grant and I replaced the conditioning station broken  srcoll pump with a refurbished scroll pump which is supplied by vacuum group. The replaced pump is bagged and waiting for RPG further survey in target hall . The target hall is survey after the job, and everything is fine.

Entry  Tuesday, October 02, 2012, 11:47, David Wang, ITW, Standard Operation, TM1, Nb#7, I moved 5 shielding blocks from ITE to ITW. 

5 shielding blocks have been moved from ITE to ITW. ITW is configured to take proton beam now.

Entry  Thursday, September 27, 2012, 09:13, David Wang, ITE, Repair, TM4, , ITE MSP water circuit flow wheel had been replaced  

ITE MSP water circuit flow wheel was replaced yesterday due to poor performance.

Entry  Tuesday, September 25, 2012, 14:33, David Wang, ITW, Standard Operation, TM1, Nb#7, TM1connected in ITW 

TM 1 is in ITW now. All connections are done. The turbo pumps had been started this afternoon. The vacuum looks good so far. The water interlock check which related to TM1 are done. They are good. All TM1 water signals are visually checked and they are strong.  The rest interlock check ( MCR XT page) will be finished before shielding blocks moving. The MAA is locked and ITE is ready for proton beam.        

Entry  Tuesday, September 25, 2012, 10:34, Travis Cave, ITW, Standard Operation, TM1, Nb#7, module move 

TM#1 with Nb#7 moved from the conditioning station to the west target station. Move went well.

Entry  Thursday, September 20, 2012, 09:16, David Wang, Conditioning Station, Standard Operation, TM1, Nb#7, TM1 Nb#7 target heat shield helium pressure check is done. 

Leak detector pumped down to base LR1.3xE-9 atm.cc/sec, and BP 8xE-3 torr. All high vacuum gauge readings at CS and TM1 are at low -6 range from 1.2xE-6torr to 4.6x E-6 torr. Applied 80 psi helium  to heat shield circuit for 5minutes and there is no any response on leak detector. The heat shield circuit is leak tight.

Entry  Thursday, September 20, 2012, 08:45, Travis Cave, Conditioning Station, Standard Operation, TM1, Nb#7, Electrical check TM1_Nb7_Elec_chk_CS.PDF

Electrical check was done at the conditioning station this morning results are on the attached PDF.

Entry  Wednesday, September 19, 2012, 11:24, Travis Cave, Conditioning Station, Standard Operation, TM1, Nb#7, module move 

TM#1 with Nb#7 was moved from the south hot cell to the conditioning station. Move went well.