Monday, January 04, 2021, 12:13, Adam Newsome, Conditioning Station, Development, TM3, , TM3 Move
|
TM3 was remotely moved from the South Hot Cell to the conditioning station. No containment box. |
Wednesday, January 06, 2021, 10:39, David Wang, ITE, Standard Operation, TM4, , ITE and TM4 annual leak check.
|
Frank and I finished ITE and TM4 primary and secondary vacuum vessel leak check. LD bease leak rate 0.0x-9atm.cc/sec. No leak has been found.Also, All TM4 water lines have been pressurized with 70psi helium fro 3 minutes on each circuit. All water lines i |
Friday, January 22, 2021, 12:34, David Wang, ITE, Standard Operation, , , ITE HV test.
|
ITE annual HV test is done. No module in station. The bias power supply has been ramped up to 49KV on control page. We still have voltage limit issue
on this PS at 48KV so it only can go to 47.7 KV on PS panel. No major spark during test.. The test result is same as last year test which was did in March
2020. |
Monday, January 25, 2021, 10:57, David Wang, South Hot-Cell, Repair, TM4, , TM4 steers short investigation.
|
Cables were disconnected for steers in containment box. The Megga measurement (500V) result from the top of the module:
Left to right: OL, left to top OL, left to bottom OL, right to top OL, right to bottom OL, Top to bottom OL. And all of them to ground
are OL. No short on cables from module top to steers itself. The short should be inside the steers. It will be confirmed with directly test on steers. |
Monday, January 25, 2021, 12:33, David Wang, ITW, Standard Operation, , , ITW bias HV test
|
Ramp up ITW bias to 57KV. no spark. 200uA leaking current at 57KV. The test is done without target module in station. ITW water circuits are looped
in pit. EE , EL are switched off during the test. |
Wednesday, January 27, 2021, 14:30, David Wang, Cooling, Development, , , High active water system purging
|
High active water are purged to holding tank at B2 level. There should be around 48 gallons are purged out of system. No purging on dump circuits
on both ITW/ ITE. |
Wednesday, February 03, 2021, 09:14, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 from TCS to SW silo.
|
TM4 is moved from TCS to SW silo. The moving is smooth.
|
Wednesday, February 10, 2021, 11:34, David Wang, Assembly/Bench Test, Standard Operation, , , Old resin can and 2A window RH clamp field measurement at silo.
|
Old resin can: 0.5 meter 360 degree rotation above silo area, 350u sv/hr. On contact 3.0 to 3.5 msv/hr. It was replaced
during 2017 winter shut down, and stored in silo since then.
2a window RH clamp: 0.5 meter, 160 usv/hr. On contact, hottest spot 3.5msv/hr, general,1.8 msv/hr. |
Wednesday, February 10, 2021, 13:30, David Wang, Safe Module Parking, Standard Operation, , , TM2 and TM4 electrical check without targets.
|
TM2 at SMP under vacuum. TM4 at silo. Frank and I did the tests. Everything is fine on TM4 check. On TM2, all mega test at 500V
are around 200K ohms which is so abnormal. We will move TM2 to TCS and start investigation there. |
Friday, February 12, 2021, 07:07, David Wang, ITE, Maintenance, , , ITW and ITE clean up.
|
Vacuum cleaned ITW and ITE station. |
Tuesday, February 16, 2021, 14:00, Adam Newsome, Crane, Development, , , Crane pendant upgrade
|
The crane pendant for the main hoist was upgraded to a FLEX EX2 style pendant by Canco Cranes. The installation work was performed by Matt at Canco,
supervised by Tom Kauss, David Wang, and Adam Newsome. Installation work was performed in two phases since the initial installation did not provide adequate
range and an antenna issue needed to be resolved (I2021-01-14-1, |
Thursday, February 18, 2021, 12:33, David Wang, ITE, Repair, , , ITE:TP1S
|
ITE TP1S new pump is installed today. Reset pump life time on controller to 0 hr. |
Thursday, February 18, 2021, 12:59, David Wang, Assembly/Bench Test, Maintenance, , , TM3 source tray and old resin can storage in lower cyclotron basement
|
TM3 old source tray, old target hall high active water resin tank, and old 2A window RH clamp are transferred from TH to cyclotron lower vault
basement 10 and 10A location for storage. They are placed beside and in front of old TM1 and TM2 source tray boxes which stored there in 2018. |
Tuesday, February 23, 2021, 09:00, David Wang, Assembly/Bench Test, Maintenance, , , target staion vacuum pumps inspection.
|
Edi and I inspected roughing pump ITM MP1, primary backup pump ITHMP1, and secondary backup pump ITHMP2. We checked oil level and color on all pumps.
Refilled lubricant to ITMMP1. ITHMP1 and MP2 oil level is fine. ITH MP1 oil color is darker than MP2. But, both them are ok still. Shielding block has
been restored after the job. |
Thursday, February 25, 2021, 10:09, Frank Song, ITE, Repair, , , Disconnect Entrance Module in ITE
|
David and I disconnected entrance module in ITE by following the procedure # 190510. And, the yoke was installed and left on for remote handling
later. |
Tuesday, March 02, 2021, 08:12, David Wang, Conditioning Station, Standard Operation, , , TCS leak check.
|
TCS leak check: TCS IG1S1.6 XE- 6 torr. LD 0.0XE-9atm.cc/sec.We used a long pole to spray helium to TCS vacuum seals on diagnostic box and vessel
body. Lots helium have been sprayed around the check area. no leak has been found. |
Thursday, March 04, 2021, 11:20, David Wang, ITW, Maintenance, , , ITW water flow wheels and coils replacement.
|
ITW water flow wheels and coils are replaced. Wheels and coils on Oven, Tube, HS, EE, MSP, Febiad coil, containment box window, dump,dump plug, 2A window,
and tank return circuits are replaced with new parts. |
Thursday, March 04, 2021, 13:54, David Wang, Conditioning Station, Standard Operation, TM3, , TM3 has been moved to NHC from silo
|
TM3 has been moved from silo to NHC. The move is successful. NHC ram stand and NHC protection railings are checked and installed. Everything works fine.
2021-03-05. TM3 has been moved from NHC to silo. The move is successful. |
Thursday, March 04, 2021, 16:30, Isaac Earle, North Hot-Cell, Development, , , NHC gas delivery lines leak checked
|
The North Hot Cell gas delivery lines (labeled 1, 2, and 3 on the hot and cold side panels) were leak checked today. 5psi helium gas was
applied to each line in turn with the appropriate solenoid valve opened and a Staubli connector with plastic tubing and the leak check wand attached to
the matching connector inside the cell. The end of the wand was sealed using tape. The Agilent G8601 leak detector was used on "sniffing" |
Friday, March 05, 2021, 09:12, Matthew Gareau, North Hot-Cell, Development, TM3, , Containment box door removal and swivel arm test
|
First thing I entered into the NHC to install to the target kart mounting clip, and remove excess tools and materials from the hotcell
After the TM3 without a target was lowered into the NHC.
Once inside, with the use of the manipulators, I was able to remove the containment box door, place it on the swivel arm, move the arm out of the |
|