Entry  Wednesday, September 28, 2016, 13:47, David Wang, Conditioning Station, Standard Operation, , , TCS pumping down during mini-shut down. 
Entry  Friday, September 30, 2016, 14:34, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 131(Sep-Dec, 2016)  Target_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131_Sep_to_Dec.pdf
Entry  Wednesday, October 12, 2016, 10:01, David Wang, Conditioning Station, Standard Operation, , , TCS pumps are stopped 
Entry  Wednesday, October 26, 2016, 12:33, David Wang, Conditioning Station, Standard Operation, TM2, , Target Hall schedule for beam schedule 131(Sep-Dec, 2016) Target_Hall_shedule_131__Sep_to_Dec_2016.pdfTarget_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131_Sep_to_Dec.pdf
Entry  Wednesday, November 02, 2016, 09:12, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#50, module moved 
Entry  Wednesday, November 02, 2016, 13:41, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 has been connected at TCS.  
Entry  Thursday, November 03, 2016, 08:57, David Wang, Conditioning Station, Standard Operation, TM4, , Helium pressure test on TM4 HS line at TCS 
Entry  Thursday, November 03, 2016, 09:01, David Wang, Conditioning Station, Standard Operation, TM4, , TCS water system has been started for TM4. 
Entry  Tuesday, November 08, 2016, 07:47, David Wang, Conditioning Station, Standard Operation, TM4, , TCS water and vacuum pumps are switched off 
Entry  Tuesday, November 15, 2016, 07:53, David Wang, Conditioning Station, Standard Operation, TM4, , Target Hall schedule for beam schedule 131(Sep-Dec, 2016) Target_Hall_shedule_131_Sep_to_Dec.pdfTarget_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131__Sep_to_Dec_2016.pdf
Entry  Tuesday, November 22, 2016, 14:26, David Wang, Conditioning Station, Standard Operation, , , TCS vacuum pumps are switched off 
Entry  Wednesday, November 23, 2016, 14:21, Travis Cave, Conditioning Station, Standard Operation, TM2, UC#18, module moved 
Entry  Wednesday, November 23, 2016, 16:21, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 and TCS vacuum system has been connected. 
Entry  Thursday, November 24, 2016, 09:33, Anders Mjos, Conditioning Station, Standard Operation, TM2, UC#18, Conditioning UC#18 
Entry  Thursday, November 24, 2016, 10:30, David Wang, Conditioning Station, Standard Operation, TM2, , HV cover is installed on TM2 at TCS 
Entry  Tuesday, November 29, 2016, 06:27, David Wang, Conditioning Station, Standard Operation, TM2, , TCS water pumps are stopped 
Entry  Tuesday, November 29, 2016, 07:50, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 is disconnected at TCS. 
Entry  Wednesday, November 30, 2016, 16:31, David Wang, Conditioning Station, Repair, TM3, , TM3 vacuum system have been connected at TCS. 
   +  Reply  Monday, December 05, 2016, 10:04, Aurelia Laxdal, Conditioning Station, Repair, TM3, , TM3 vacuum system have been connected at TCS. 
   +  Reply  Friday, December 09, 2016, 18:05, Aurelia Laxdal, Conditioning Station, Repair, TM3, , TM3 vacuum system have been connected at TCS. 