Message ID: 1338     Entry time: Thursday, August 25, 2016, 08:43
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: All TM2 connections to TCS are done. 

The HV cover is installed. The Faraday cage at B2 level is locked also.The TCS and TM2 are still pumping down. Everything is good so far.