Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1348
Entry time:
Thursday, September 08, 2016, 16:30
Author:
David Wang
Category:
Conditioning Station
Type:
Repair
Module:
TM3
Target/Number:
Subject:
TM3 vacuum system have been connected at TCS.
start of roughing now.
start of TCS and TM3 turbo-pumps. Everything is good so far.
ELOG V2.9.2-2455