Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1384     Entry time: Wednesday, October 26, 2016, 12:33
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: Target Hall schedule for beam schedule 131(Sep-Dec, 2016) 

Update TH schedule after job delay on TM2 Febiad target. Everything should be back to schedule on last two targets. See attachments.

Attachment 1: Target_Hall_shedule_131__Sep_to_Dec_2016.pdf  81 kB  | Show | Hide all
Attachment 2: Target_Hall_shedule_131_Sep_to_Dec.mpp  299 kB
Attachment 3: Target_Hall_shedule_131_Sep_to_Dec.pdf  158 kB  | Show | Hide all
ELOG V2.9.2-2455