Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1359
Entry time:
Friday, September 23, 2016, 07:49
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM4
Target/Number:
Subject:
TM4 has been moved and connected at TCS
All TCS and TM4 turbo-pumps were started yesterday. Overnight pumping down is good so far.
ELOG V2.9.2-2455