ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  767   Friday, October 17, 2014, 13:36 Anders MjosConditioning StationMaintenance  TCS:Chil staging not operationalNOTE: If cooling is required, the
compressors will have to be run manually.
Make sure to switch it off again when the
  
  774   Wednesday, October 22, 2014, 13:05 Anders MjosConditioning StationMaintenance  Controls upgrade on TCS See work
permit for details
  
  781   Wednesday, November 05, 2014, 14:21 Anders MjosConditioning StationDevelopment  Jumper installed on TGHT, TBHT and COIL A copper bar jumper (ITD0488) was
installed on the TGHT, TBHT and COIL conductors
on the taregt hall side for TCS testing.
 Jumper1.jpgJumper2.jpg 
  815   Friday, December 05, 2014, 13:46 Anders MjosConditioning StationDevelopmentTM2 Not able to start water system TCS:WPV1 does not open when staging
is enabled. Multiple attempts have been made,
but the valve remains closed.
  
  816   Friday, December 05, 2014, 15:41 Anders MjosConditioning StationDevelopmentTM2 RGA resultsMeasurement taken at 14:25. IG2 at ~7.7E-6
T
 2014-12-05-14-25_TM2.png2014-12-05-14-25_TM2.txt 
  817   Monday, December 08, 2014, 13:52 Anders MjosConditioning StationDevelopmentTM2 Fixed - Not able to start water system

    

       
            
  
  818   Monday, December 08, 2014, 15:22 Anders MjosConditioning StationDevelopmentTM2 Circuit D water testMonday, December 08, 2014, 14:00: Dan M
and Anders connected the water supply to
circuit D and installed the module cover.
 TCS_Heater_Transmission_Power.xlsxCircuit_D_test_results_for_TM2_status_meeting_2014-12-11.pdfHeated_water_leak_test_plan.pdfHeated_water_leak_test_Circuit_D_RESULTS.docx 
  819   Monday, December 15, 2014, 08:50 Anders MjosConditioning StationMaintenanceTM2 TK2 level below 15 in (secondary loop) The level dropped below 15 in over
the weekend. MP2 stopped, but MP3 condtinued
pumping.
  
  820   Monday, December 15, 2014, 09:41 Anders MjosConditioning StationMaintenanceTM2 Water leak found at the isolation transforer

    

       
            
  
  821   Monday, December 15, 2014, 12:53 Anders MjosConditioning StationMaintenanceTM2 TCSTK2 topped up

    

       
            
  
  822   Monday, December 15, 2014, 13:25 Anders MjosConditioning StationMaintenanceTM2 BIASSW1 temperature and flow removed from interlock chain

    

       
            
  
  824   Tuesday, December 23, 2014, 14:10 Anders MjosConditioning StationDevelopmentTM2 He leak check of the Service Cap using RGAThe RGA showed no response to He-spray
on the Service Cap. He stable at 3.5E-9 T
partial pressure, water at 1.3E-6 T. IG1
  
  825   Monday, January 05, 2015, 12:47 Anders MjosConditioning StationDevelopmentTM2 Cooling package started by "enable staging" button.
MP3 has to be turned off-on to open WPV1
  
  826   Monday, January 05, 2015, 15:01 Anders MjosConditioning StationDevelopmentTM2 RGA switched on    
  828   Tuesday, January 06, 2015, 11:21 Anders MjosConditioning StationDevelopmentTM2 He leak check of cooling circuits.No leak detected on either He-detector
(connected directly to Service Cap) or on
RGA. See attached screen shots.
 2015-01-06_He_leak_check_water_circuits.pdf 
  829   Wednesday, January 07, 2015, 09:31 Anders MjosConditioning StationDevelopmentTM2 High Voltage ConditioningNo Source Tray installed. Loop on cooling
circuit D. All other circuits blanked off.
Voltages stated below are set point
  
  832   Thursday, January 08, 2015, 15:24 Anders MjosConditioning StationDevelopmentTM2 Fault 2 on chiller unit Found both VFDs with OF3 fault (over
voltage during constant speed operation).
Thursday, January 08, 2015, 16:37:
 Capture.PNGVFD_Fault.jpg 
  836   Wednesday, January 28, 2015, 10:42 Anders MjosConditioning StationMaintenanceTM2 TCS shut down for site wide power outage    
  845   Tuesday, February 17, 2015, 13:06 Anders MjosITEDevelopment  Resistance measured of TGHT and TBHT lines to ITEThe copper bars was installed by David
and Anders. After the measurements were completed,
the copper bars were removed.
 002.JPGResistance_from_Electrical_Room_to_Target_Station.xlsx 
  846   Tuesday, February 17, 2015, 13:07 Anders MjosITWDevelopment  Resistance measured of TGHT and TBHT lines to ITW See e-log entry
for ITE for details. The copper bars have
not been removed. They can be used for testing
  