ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  538   Tuesday, November 12, 2013, 10:59 Bevan MossSouth Hot-CellStandard OperationTM2 Electrical Test Don Jackson and Myself completed
started an electrical test on TM2. All lines
passed the with OL to ground. When testing
 tm2_elec_test.pdf 
  1900   Tuesday, March 26, 2019, 11:17 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Checks of TM#2 during the source tray change. The four electrical check done on
TM#2 during the source tray change.
 Elecrictal_Check_TM#2_Old_source_Tray_Jan_11_2019.pdfElectrical_Check_TM#2_No_Source_Tray_Feb_25_2019.pdfElectrical_Check_TM#_New_source_Tray_Mar_22_2019.pdfElectrical_Check_TM#2_new_source_tray_Mar_25_2019.pdf 
  1360   Friday, September 23, 2016, 08:55 Travis CaveConditioning StationStandard OperationTM4SiC#34Electrical ChecksThe bundle of electrical checks, first
one is the Iglis that failed, the second
is the everything passed at the hot cell
 TM4_elechk_SiC34_SHC.PDF 
  1382   Monday, October 24, 2016, 14:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical ChecksResults of the electrical check of TM#2
with no target after the repair and with
the SiC#35 mounted on the module.
 TM2_elechk_notgt_SHC_repair.PDFTM2_elechk_SiC35_SHC.PDF 
  123   Friday, June 08, 2012, 15:03 Don JacksonSouth Hot-CellStandard OperationTM1Ta38Electrical Check on new Ta38 at hot cellMegger checks were exceptionally high (good). 
Readings taken less than 2 hours after reading low
values from end of run on Nb#6.  Tests
 Ta38_New_Target.JPG 
  1517   Monday, May 01, 2017, 13:11 David WangSouth Hot-CellRepairTM3 Electrical Check on TM3 after fibergalss is moved in SHC. RU( coil 1), F (anode), and 60kv bias(HS,
Gasline, and MSP)  are shorted together.
Other lines are good.  They are measured
  
  1597   Tuesday, August 15, 2017, 09:27 Anders MjosSouth Hot-CellStandard OperationTM2SiC#36Electrical Check of target in SHC

    

       
            
  
  2354   Tuesday, August 09, 2022, 12:23 Frank SongNorth Hot-CellStandard OperationTM4Ta #64Electrical Check for TM4 with Ta#64 after beam at NHC An electrical check made at NHC right
after TM4 moving from ITE.
 tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg 
  1484   Friday, April 07, 2017, 09:53 Travis CaveConditioning StationMaintenanceTM1no targetElectrical Check and TM1 other checksResults of an electrical check on TM#1
with no target attached to it.
 I use this e-log entry for
 TM1_elec_chk_no_tgt.PDF 
  122   Friday, June 08, 2012, 15:00 Don JacksonSouth Hot-CellStandard OperationTM1Nb#6Electrical Check Nb#6 at end of runMegger check values were low but still
within operational range.
 Nb#6_End_of_Run.JPG 
  1004   Tuesday, July 21, 2015, 09:21 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check FailedTM#2 has failed the electrical check see
attached pdf for details.
 TM#2_elec_chk_source_tray_no_tgt.PDF 
  922   Monday, June 01, 2015, 14:24 Travis CaveSouth Hot-CellStandard OperationTM4Ta#45Electrical CheckPost beam electrical check on the Ta#45
target installed on TM#4. See attached PDF.
 TM4_Ta45_elecchk_postbeam.PDF 
  925   Tuesday, June 02, 2015, 10:39 Travis CaveSouth Hot-CellStandard OperationTM4SiC#31Electrical CheckElectrical check on TM#4 with SiC#31. See
attached PDF for details.
 TM4_SiC31_elecchk_SHC.PDF 
  1008   Wednesday, July 22, 2015, 11:31 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical CheckElectrical check done on TM#2 around the
25th of June 2015, this was before the coil
line leak was found.
 TM#2elecchksourcetraynotgt62515.PDF 
  1013   Monday, July 27, 2015, 12:12 Travis CaveSouth Hot-CellStandard OperationTM4SiC#31Electrical CheckElectrical check of TM#4 post beam with
target (SiC#31) on and module without target
on. There is a short between the target and
 TM4_elecchk_notgt.PDFTM4SiC31postbeamelecchk_.PDF 
  1014   Monday, July 27, 2015, 13:38 Travis CaveSouth Hot-CellStandard OperationTM4UC#13Electrical CheckElectrical check of TM#4 with UC#13 at
the south hot cell. See PDF for details.
 TM4UC13IGLISelecchkSHC.PDF 
  1021   Tuesday, July 28, 2015, 14:31 Travis CaveConditioning StationStandard OperationTM4UC#13Electrical CheckTM#4 with UC#13 electrical check at the
conditioning station under vacuum. See attached
PDF.
 TM4UC13IGLISelecchkCS.PDF 
  1034   Thursday, August 13, 2015, 11:34 Travis CaveSouth Hot-CellStandard OperationTM2Dummy TargetElectrical CheckElectrical check of TM2 without target
after that widget has installed, electrical
check with the shunts on, electrical check
 TM2_elechknotgtafterwidget.PDFTM2_elechknotgtshunt.PDFTM2_elecchkdummytgt.PDF 
  1043   Thursday, August 20, 2015, 11:00 Travis CaveConditioning StationStandard OperationTM2Dummy TargetElectrical CheckTM#2 electrical check at the conditioning
station. All pumps were off but the module
was not vented.
 TM2_elecchkdummytgtatCS.PDF 
  1047   Wednesday, August 26, 2015, 09:20 Travis CaveSouth Hot-CellStandard OperationTM2ZrC #7Electrical CheckElectrical check of TM#2 with ZrC #7 installed  TM2_elec_chk_ZrC7_SHC.PDF 