Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 761     Entry time: Tuesday, October 14, 2014, 11:52
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: ZrC#6 
Subject: Electrical check 

TM#1 with ZrC#6 post beam electrical check see attached pdf for results.

Attachment 1: TM1_ZrC6_postbeam.PDF  129 kB  | Show | Hide all
ELOG V2.9.2-2455