1520
|
Tuesday, May 02, 2017, 18:33 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 HV tests at atmosphere for Each Line(s) after the Fiber Glass removal May 2, 2017 | Today a HV test at atmosphere was performed
for Each Line(s), while floating the other
lines. THIS TEST AT ATMOSPHERE IS THE FIRST |
|
|
1522
|
Thursday, May 04, 2017, 19:10 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | no target | TM3 HV test at TCS up to 50kV | Today TM3 was conditioned up to 50kV. At
50kV sparking started and to go higher in
voltage it needs more conditioning time. |
|
|
1525
|
Friday, May 05, 2017, 19:36 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | no target | TM3 HV test at TCS up to 65kV | Today TM3 HV conditioning went up to 65kV.
I'll leave it here over night. ISAC OPS have
instructions to keep an alarm on the HV, |
|
|
1526
|
Saturday, May 06, 2017, 13:30 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | no target | TM3 current limiting | Today the voltage was raised from 65kV
to 65.7kV. After about 10min at this level
TM3 started current limiting. TM3 was not |
|
|
1585
|
Monday, July 17, 2017, 17:50 |
Aurelia Laxdal | Conditioning Station | Development | TM3 | No target | Conditioning TM3 |
|
|
|
2452
|
Tuesday, June 06, 2023, 15:10 |
Antoniette Yap | Spent Target Vault | Maintenance | | | Annual Inspection of Main and Mini Storage Vaults | The annual inspection of the mini-storage
vault and main storage vault was completed
June 23, 2023. The following items were checked: |
|
|
78
|
Tuesday, March 13, 2012, 12:24 |
Anders Mjos | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 Autopsy |
|
|
|
223
|
Wednesday, December 05, 2012, 15:53 |
Anders Mjos | South Hot-Cell | Standard Operation | | UCx#5 | Target inspection - target tube broken | The target was inspected today.
It was found that the target tube
had broken on both sides of the centre block |
|
|
421
|
Thursday, August 15, 2013, 16:35 |
Anders Mjos | ITE | Repair | TM4 | SiC#29 | Leak found on Coil 1 | By
pressurizing the water lines with 70 psi |
|
|
422
|
Monday, August 19, 2013, 10:08 |
Anders Mjos | ITE | Repair | TM4 | SiC#29 | Leak Check | All water circuits except Coil 1 were leak
checked by David and Anders. No obvious signals
were detected except some small possible |
|
|
499
|
Tuesday, October 08, 2013, 14:58 |
Anders Mjos | South Hot-Cell | Standard Operation | | SiC#29 | Target to Heat Shield electrical short | The SiC#29 CTL target has been taken apart
with the help of Isaac and Chad. Electrical
measurements were done between Target and |
|
|
517
|
Tuesday, October 22, 2013, 14:23 |
Anders Mjos | ITE | Standard Operation | TM3 | NiO#2 | Padlle wheel frequency measurements | as measured today in the electrical room
by David and Anders |
|
|
525
|
Thursday, October 24, 2013, 15:43 |
Anders Mjos | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance | The conductance check on the electrical
check was found to be outside of accepted
values for the TBHT at 7.0 mOhm. A successful |
|
|
529
|
Friday, October 25, 2013, 13:39 |
Anders Mjos | ITE | Standard Operation | TM3 | NiO#2 | Padlle wheel frequency measurements | with TM4 in ITW as measured today in the
electrical room by David and Anders.
|
|
|
532
|
Thursday, October 31, 2013, 11:38 |
Anders Mjos | ITE | Standard Operation | TM3 | NiO#2 | Padlle wheel frequency measurements | with TM4 in ITW as measured today in the
electrical room by David and Anders. |
|
|
554
|
Thursday, November 21, 2013, 12:12 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | NiO#2 | End of beam target inspection - ANODE does not hold 250V | The target was inspected by Chad and Anders
in the Hot Cell. Electrical megger tests
were done during the assembly. It was found |
|
|
588
|
Wednesday, January 22, 2014, 15:20 |
Anders Mjos | South Hot-Cell | Standard Operation | | UC#8 | Target Inspection - post beam | The Target Assembly was inspected with
Chad, Jens Henning and Anders today.
The Target Container was |
|
|
639
|
Friday, April 04, 2014, 16:59 |
Anders Mjos | ITW | Development | | | Flow meters installed on Heat Shield and Coil water return | David W. has installed two SST Proteus
flow meters, model OV7006FTA32, on ITW Heat
Shield and Coil. The flow meters are connected |
|
|
651
|
Wednesday, April 16, 2014, 10:16 |
Anders Mjos | ITW | Development | TM3 | Ta#42 | Flow meters installed on Heat Shield and Coil water return |
|
|
|
682
|
Friday, June 13, 2014, 10:33 |
Anders Mjos | ITW | Development | TM1 | UC#9 | Flow meter data | Coil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE |
|