ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  1918   Friday, May 10, 2019, 10:23 chad fisherSouth Hot-CellRepair  West Entrance module wire scanner replacementWest entrance module - visible broken or
disconnected wire visible on old/existing
wire scanner. Wire scanner removed, new one
 20190509_085908.jpg20190510_101235.jpg 
  1919   Monday, May 13, 2019, 09:55 Travis CaveITWStandard Operation  Entrance module move The West Entrance module has been
moved from the south hot cell to the west
target station.
  
  1920   Monday, May 13, 2019, 11:22 David WangITWRepair  ITW entrance module has been connnected.Entrance module has been connected back
to ITW. Everything is normal.
  
  1921   Wednesday, May 15, 2019, 16:06 Isaac EarleSafe Module ParkingDevelopment  SMP module support flange installed and leak checkedThe SMP module support flange sub-assembly
(IRH1755) was installed today according to
drawing IRH1683.  Dow Corning 111 sealing
 20190515_094730.jpg20190515_094740.jpg20190515_103253.jpg20190515_103824.jpg 
  1925   Friday, May 17, 2019, 16:46 Adam NewsomeSafe Module ParkingDevelopment  SMP Controls Installation Update 
The following controls-related
 IMG_20190417_100838.jpgIMG_20190417_100843.jpgIMG_20190517_162230.jpgIMG_20190517_162305.jpg 
  1927   Wednesday, May 22, 2019, 11:50 David WangITEStandard OperationTM4 TM2 has been connected in ITE.TM2 has been connected in ITE. high active
water system and vacuum pumps are started.
The pumping down on TM2 and ITE is good 
 Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf 
  1928   Wednesday, May 22, 2019, 11:52 David WangConditioning StationMaintenanceTM1 TM1 inpsection.TM1 shielding plates and their holding
bolts are inspected. No corrosion. 
TM1 is located at TCS now. Both TP1 and TP2
  
  1930   Thursday, May 23, 2019, 11:22 Travis CaveSouth Hot-CellMaintenance  Removing garbage from the south hot cell. A 55 Gal. drum was remotely lowered
into the south hot cell. It was then filled
with compressable waste. Then the drum was
  
  1932   Tuesday, June 04, 2019, 08:46 David WangITEStandard OperationTM2 ITE water signal interlock check.ITE water signal interlock check is done.
Everything is good. Coil 2   circuit
no longer used in ITE . PQRU are looped as
  
  1935   Friday, June 07, 2019, 13:11 David WangConditioning StationDevelopmentTM4 TCS and TM4. TM4 has been connected at TCS for HV test.
TCS water system and vacuum pumps are switched
on. 
  
  1937   Monday, June 10, 2019, 14:13 Travis CaveSpent Target VaultStandard Operation  Old TM#4 source tray moved The old TM#4 source tray in the south
hot cell was moved to the spent target vault.
The tray had a low of 7.5mSv/hr to a high
  
  1942   Thursday, June 13, 2019, 10:55 David WangConditioning StationRepairTM4 TM4 HV test at TCS without source tray.I brought up TCS bias to 57.5 KV on TM4
without source tray at TCS. It was kept at
this level about 1.0 hours. Some intermediate
  
  1943   Friday, June 14, 2019, 08:15 David WangITEStandard OperationTM2 5 shielding blocks are moved to ITE. ITE is configured to take proton beam.   
  1944   Thursday, June 20, 2019, 15:09 Isaac EarleSafe Module ParkingDevelopment  SMP motor wiring inspected by electricianThe AC wiring for the SMP motor was inspected
by Randy Boehm (TRIUMF electrician) as recommended
by Franco Mammarella (TRIUMF electrical engineer). 
  
  1945   Friday, June 21, 2019, 07:16 David WangSouth Hot-CellDevelopmentTM4 TM4 new source tray leak check at SHC.New source tray was installed on TM4 yesterday.
LD was used to pump down all water lines.
Tube heater +D circuit has a big leak 
  
  1946   Thursday, July 04, 2019, 08:57 Isaac EarleSafe Module ParkingDevelopment  SMP vacuum system installed July 3:
- Assembled exhaust line flexible
hose and fittings as per ISK0529 Rev D then
 20190703_122635.jpg20190703_122646.jpg20190703_122702.jpg 
  1950   Monday, July 15, 2019, 13:29 David WangConditioning StationDevelopmentTM4 Vacuum surge when TM4 B line iwas supplied with water.Yesterday, TM4 B line was supplied with
water at TCS for testing.  TCS: IG1
and IG2 had big response on it. See attachment.
 vacuum_surge_on_B_line_with_water.png 
  1953   Friday, July 26, 2019, 11:28 David WangSouth Hot-CellStandard OperationTM4 TM4 move from SHC to TCS.Tm4 has been moved from SHc to TCS without
containment box. It is a new source tray
on TM4.  A layer of plastic sheet was
  
  1954   Friday, July 26, 2019, 11:41 David WangSouth Hot-CellStandard OperationTM4 TM4 with spare target electrical check and leak check.Electrical check on TM4 with spare test
target. PQ is still shorted to RU. But, The
short between 60KV bias and PQRU which we
  
  1955   Friday, July 26, 2019, 15:43 Isaac EarleSafe Module ParkingDevelopment  SMP vacuum control system completed The SMP vacuum control system has
been wired and setup to be controlled from
EPICS.  Backing valve control (SMP:BV1)
 SMP_vacuum_system_EPICS_screen.png 