Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1932     Entry time: Tuesday, June 04, 2019, 08:46
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: ITE water signal interlock check. 

ITE water signal interlock check is done. Everything is good. Coil 2   circuit no longer used in ITE . PQRU are looped as one circuit fro coil 1 circuit on Module since now.

ELOG V2.9.2-2455