398
|
Friday, July 05, 2013, 10:02 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No source tray | TM3 module move to TCS |
TM3 has been moved from the south hot cell to the conditioning station. David and I completed the move. All went well. |
397
|
Friday, July 05, 2013, 09:22 |
chad fisher | South Hot-Cell | Repair | TM3 | | Service Tray Water Block Inspection |
I have inspected the service tray water block and suggest that they SHOULD be cleaned/polished before we install the new source tray.
The water blocks have slight water scalling to the inside of the ID of where the c seals locate.
I have taken two close up pictures of each water block for reference and to document their current state. They can be found at http://documents.triumf.ca/docushare/dsweb/View/Collection-10841
|
396
|
Thursday, July 04, 2013, 11:37 |
David Wang | ITW | Standard Operation | TM1 | UCx | I reconnected TM1 to ITW. |
I reconnected TM1 to ITW on 02 July.The pumping down is good so far. TM1 water interlock check is good also. |
395
|
Wednesday, July 03, 2013, 10:43 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move |
TM#3 with no target and no source tray was moved from the north east silo to the south hot cell the move went well. |
394
|
Wednesday, July 03, 2013, 08:44 |
chad fisher, Travis Cave | South Hot-Cell | Standard Operation | | | Ta#39 Transfered to spent target storage vault |
Ta#39 has been transferred to spent target storage vault. Ta#39 was placed into pail #106 and placed into spot of 4C of the spent target vault. The pail measured 95.8mSv/hr upon removal from the hot cell. See attached PDF for details. |
393
|
Wednesday, July 03, 2013, 08:43 |
chad fisher | South Hot-Cell | Standard Operation | | | Ta#39 Transfered to spent target storage vault |
|
392
|
Tuesday, July 02, 2013, 10:58 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#6 | module move |
TM#1 with UC#6 has been moved from the conditioning station to the west target station, move went well. |
391
|
Tuesday, July 02, 2013, 09:37 |
chad fisher | South Hot-Cell | Development | TM3 | | TM3 Rev.2 Source Tray Disposal |
Tm3 Rev.2 source tary has been transfered to the vault tunnel storage. |
390
|
Thursday, June 27, 2013, 14:27 |
chad fisher | South Hot-Cell | Development | | | Polishing Cleaning tool - Water blocks |
The polishing/cleaning tool prototype is now finished and appers to work great.
Thanks to Dan and Maico for the great job making my design a reality. |
389
|
Thursday, June 27, 2013, 14:23 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Ta#39 Autopsy performed |
An autopsy of Ta#39 was performed yesterday and today. Ta#39 will be sent to the spent target storage vault on Tuesday.
|
388
|
Thursday, June 27, 2013, 14:21 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ucx#6 | Ucx#6 installed Ta#39? rewmoved |
Ucx#6 was installed on TM1 on Wednesday.
Ta#39 was removed. |
387
|
Wednesday, June 26, 2013, 11:03 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 UCx target heat shield |
Chad and I leak checked the TM1 UCx target heat shield at SHC. No leak has been found so far. |
386
|
Tuesday, June 25, 2013, 14:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#6 | Roughing Pumps Started |
The roughing pumps have been started on the conditioning station. As it is late in the day for David he will make the turbo pump connections tomorrow. |
385
|
Tuesday, June 25, 2013, 14:24 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#6 | module move |
Module moves of TM#1 with Ta#39 from ITW to SHC then TM#1 with UCx#6 from SHC to the conditioning station moves went well. |
384
|
Tuesday, June 25, 2013, 13:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#6 | Electrical check |
Results from the electrical check of TM#1 with the UC#6 target. See attached PDF. |
383
|
Friday, June 21, 2013, 09:26 |
chad fisher | South Hot-Cell | Development | TM3 | | Mock-up Leak Check Results |
The Mock-up has been leak tested after the remote connection of the water blocks and is leak tight!
Thanks everybody who contributed to its success. |
382
|
Thursday, June 20, 2013, 13:47 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay |
Ten targets have been assayed or had field measurements(they were too hot to ship but were assayed the last time an assay was done) done on them over the past two days. Of those that have been assayed we have total of ten shippable targets. See the attached PDF for the latest details of the storage vault. |
381
|
Wednesday, June 19, 2013, 08:15 |
chad fisher | South Hot-Cell | Development | TM3 | | Mock up water block connections |
All water block connections on the mock-up have bben achieved. It is now ready for leak checking.
The front half of the water block jig proved extremely difficult to remove. |
380
|
Tuesday, June 18, 2013, 14:00 |
chad fisher | South Hot-Cell | Development | TM3 | | Mock-up testing / water block connections |
The testing of the mock-up and tooling has commenced.
Source tray mock-up has been driven into the mock-up and the first two water block connections have been made; the first with the torque limiting
T-handle tool and the second with the torque limiting air rachet attachment. Both seem to work well, although achieving the required torque with the manipulators proved to be near the limit of the manipulator.
|
379
|
Thursday, June 13, 2013, 09:21 |
chad fisher | South Hot-Cell | Development | | | Warm Cell Mock-up |
the warm cell mock-up has been inserted into the warm cell and final preparation for the remote test are being made. |