Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC, Page 117 of 135
Not logged in
Back
|
Find
|
Select
|
Help
|
Login
Full
|
Summary
| Threaded | Collapse |
Expand
2695 Entries
Goto page
Previous
1
,
2
,
3
...
116
, 117,
118
...
133
,
134
,
135
Next
Thursday, June 27, 2013, 14:21, chad fisher, South Hot-Cell, Standard Operation, TM1, Ucx#6, Ucx#6 installed Ta#39? rewmoved
Wednesday, June 26, 2013, 11:03, David Wang, South Hot-Cell, Standard Operation, TM1, , Leak check on TM1 UCx target heat shield
Tuesday, June 25, 2013, 14:56, Bevan Moss, Conditioning Station, Standard Operation, TM1, UCx#6, Roughing Pumps Started
Tuesday, June 25, 2013, 14:24, Travis Cave, Conditioning Station, Standard Operation, TM1, UC#6, module move
Tuesday, June 25, 2013, 13:20, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#6, Electrical check
Friday, June 21, 2013, 09:26, chad fisher, South Hot-Cell, Development, TM3, , Mock-up Leak Check Results
Thursday, June 20, 2013, 13:47, Travis Cave, Spent Target Vault, Standard Operation, , , Spent Target Assay
Wednesday, June 19, 2013, 08:15, chad fisher, South Hot-Cell, Development, TM3, , Mock up water block connections
Tuesday, June 18, 2013, 14:00, chad fisher, South Hot-Cell, Development, TM3, , Mock-up testing / water block connections
Thursday, June 13, 2013, 09:21, chad fisher, South Hot-Cell, Development, , , Warm Cell Mock-up
Thursday, June 13, 2013, 09:18, chad fisher, South Hot-Cell, Repair, TM3, , Source Tray/Extraction Column Removal
Wednesday, June 12, 2013, 10:39, Travis Cave, South Hot-Cell, Standard Operation, , , spent source tray removal
Tuesday, June 11, 2013, 10:05, David Wang, ITW, Standard Operation, TM1, , Disconnected TM1 in ITW.
Tuesday, June 04, 2013, 15:34, Bevan Moss, Conditioning Station, Repair, , , Relay replaced
Tuesday, June 04, 2013, 12:36, David Wang, ITE, Standard Operation, TM4, , 5 shielding blocks are transferred from ITW to ITE
Friday, May 31, 2013, 11:19, Travis Cave, Spent Target Vault, Standard Operation, , SiC#28 (RFQ Target), Spent target move
Wednesday, May 29, 2013, 12:07, chad fisher, South Hot-Cell, Development, , SiC#28 RFQ, RFQ Autopsy
Wednesday, May 29, 2013, 06:32, David Wang, ITE, Standard Operation, TM4, Ta#40, TM4 has been connected in ITE.
Tuesday, May 28, 2013, 10:42, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#40, Electrical check
Tuesday, May 28, 2013, 10:37, Travis Cave, ITE, Standard Operation, TM4, Ta#40, module move
Goto page
Previous
1
,
2
,
3
...
116
, 117,
118
...
133
,
134
,
135
Next
ELOG V2.9.2-2455