476
|
Friday, September 27, 2013, 12:53 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HP TGHT and TBHT conditioning | Yesterday TM3 had the TGHT current
raised to 160 amps and the TBHT raised to
200 amps. At this power the TGHT showed typical |
 |
489
|
Friday, October 04, 2013, 19:05 |
Grant Minor | Conditioning Station | Standard Operation | TM3 | NiO#2 | HP Conditioning - e-mail notes from Oct 2nd to Oct 4th | I have compiled the e-mail comments from
people involved in High-Power Conditioning
of TM3 w/ the new Rev 3 source tray and NiO#2 |
|
493
|
Sunday, October 06, 2013, 15:39 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM3 | NiO#2 | HEATERS STARTED | The high voltage was sparking several times
during the night. It may be correlated with
the cycling of the cooling water temperature |
|
2560
|
Monday, April 08, 2024, 09:29 |
David Wang | Cooling | Standard Operation | | | HALCW system general inspection. | water are supplied to both ITE and ITW.
I did a general inspection on HALCW system.
Two small leaks on 2" shut off valves |
|
2495
|
Friday, October 13, 2023, 11:46 |
David Wang | Cooling | Maintenance | | | HALCW system O2 sensor service and calibration. | HALCW system O2 sensor service and calibration
were done in Sep 26th. electrolyte and membrane
on rose mount sensor 499ADO were refilled |
|
1444
|
Monday, March 06, 2017, 08:01 |
David Wang | Cooling | Repair | | | HALCW resin tank replacement. | HALCW resin tank has been replaced. The
old tank is stored in middle-west silo now.
The field on old resin tank bottom is about |
11x |
1164
|
Monday, March 14, 2016, 11:24 |
David Wang | ITE/ITW Cooling | Maintenance | | | HALCW resin tank filter cartridges are changed today | Two of resin tank filter cartridges(supply
and return) are changed today. Old cartridges
and bagged and tagged. The contact field |
  |
2781
|
Monday, March 03, 2025, 15:33 |
David Wang | Cooling | Maintenance | | | HALCW resin can loop two filters have been replaced. | HALCW resin can loop two filters have been
replaced. no water leak on after job check.
|
|
1693
|
Wednesday, March 07, 2018, 10:36 |
David Wang | ITE/ITW Cooling | Development | | | HALCW resin can flow meter replacment | HALCW resin can flow meter replacement
is done. Less that 100 mL water was drained
to a small tray during the job. RPG checked |
|
2763
|
Monday, February 03, 2025, 13:10 |
David Wang | Cooling | Standard Operation | | | HALCW pump ITC:MP1 has been started. | HALCW pump ITC:MP1 has been started. water
are supplied to both ITE and ITW system.
all water signals for individual circuits |
|
2776
|
Friday, February 21, 2025, 09:18 |
David Wang | Cooling | Standard Operation | | | HALCW pump ITC:MP1 and MP2 phase current draw measurement. | HALCW pump ITC:MP1 and MP2 phase current
draw measurement result: water supplied to
both station. MP1: Black 17.0A, blue 16.9A, |
|
2433
|
Monday, April 24, 2023, 10:18 |
David Wang | Cooling | Maintenance | | | HALCW flowmeter transmotters inspetion and calibration. | ITW, ITE, ITW +ITE total , and low active
cooling water return flow meter transmitters
are inspected and calibrated. Result: |
|
2424
|
Wednesday, March 08, 2023, 06:32 |
David Wang | Cooling | Maintenance | | | HALCW flow sensors replacement. | HALCW flow sensors replacement job is done.
All ITE/ITW(except ITE HS) return line water
flow sensors including paddle wheels and |
|
2692
|
Wednesday, September 25, 2024, 07:25 |
David Wang | Cooling | Maintenance | | | HALCW O2 level sensor maintenance. | HALCW O2 level sensor annual maintenance
is done. sensor membrane has been changed
and electrolyte has been refilled. gauge |
|
2426
|
Wednesday, March 08, 2023, 13:57 |
David Wang | Cooling | Standard Operation | | | HALCW ITC:MP1/MP2 pump and motor temerature measurements | HALCW ITC:MP1/MP2 pump and motor temperature
measurements result:
MP1: pump discharging port: |
|
2425
|
Wednesday, March 08, 2023, 09:19 |
David Wang | Cooling | Standard Operation | | | HALCW ITC:MP1/MP2 motor phase current measurement. | HALCW ITC:MP1/MP2 motor phase current measurement
is done by Joel from electrician group. MP1:17.1A/17.2A/16.7A.
MP2: 17.9A/17.9A/17.3A. 19.5A |
|
558
|
Wednesday, November 27, 2013, 12:50 |
Bevan Moss | South Hot-Cell | Standard Operation | TM3 | | Ground devices wiring check | Travis and I completed an electrical
check on the wiring harness for the devices
on the ground plane. All lines passed 500V |
|
688
|
Tuesday, June 24, 2014, 15:45 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Ground Electrode and Extraction Electrode dirty after last run | See attached pdf and DocuShare for
more photos. It may be possible to clean
some of it from the Ground Electrode. |
|
257
|
Wednesday, March 13, 2013, 07:22 |
chad fisher | South Hot-Cell | Repair | TM4 | | Ground Electrode Leak / Inspection Results | Further attempts to localize the leak were
unsucessful. The circuit was pressurized
with 60 psi air and snoop solution was applied |
    |
256
|
Tuesday, March 12, 2013, 09:18 |
chad fisher | South Hot-Cell | Repair | TM4 | | Ground Electrode Leak | On Monday, March 11 the containment box
was removed from TM4 and a vacuum leak check
preformed in an attempt to locate the leak |
|