1709
|
Thursday, May 03, 2018, 13:26 |
Anders Mjos | South Hot-Cell | Repair | TM4 | | EZL short troubleshooting | Yesterday Aaron, Isaac and Anders inspected
the EZL connection from the service chase
to the optics tray using the goose neck camera |
|
|
1710
|
Friday, May 04, 2018, 11:21 |
David Wang | ITW | Repair | | | 2A2 winodw leak check in TH | Anders and I leak checked new 2A2 window
seal on ITW side. Leak detector was connected
to ITW TP4. Base leak rate 0.0Xe-9 |
|
|
1711
|
Friday, May 04, 2018, 15:46 |
Anders Mjos | South Hot-Cell | Repair | TM4 | | EZL short troubleshooting |
|
|
|
1712
|
Wednesday, May 09, 2018, 08:48 |
David Wang | ITW | Repair | | | 2A2 winodw leak check on ITW vacuum vessel. | Leak detector is connected to ITW TP4.
LD Base leak rate 0.0XE-09 atm.cc/sec. Helium
line is connected to existing window leak |
|
|
1714
|
Tuesday, May 15, 2018, 10:21 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Tm4 water circles helium pressur test result |
Helium pressure test on TM4 water lines
is done this morning. 70 psi helim , 1 minutes |
|
|
1715
|
Thursday, May 17, 2018, 11:30 |
Anders Mjos | Conditioning Station | Maintenance | TM4 | | HV test/conditioning of damaged source tray | BIAS only. Water lines looped on top. Containment
box off.
Thursday, May 17, 2018, 11:20: Vacuum |
|
|
1716
|
Thursday, May 17, 2018, 13:17 |
Travis Cave | ITW | Standard Operation | | | Entrance module move | The west entrance module has been
moved from the silo to the west target station. |
|
|
1717
|
Friday, May 18, 2018, 09:34 |
David Wang | Conditioning Station | Repair | TM4 | | water leak on TM4 Tube heater - B line confirmed. | At 8:50 AM today, I applied water to TM4
tube heater - (B) line at TCS. All high vacuum
gauges got response on this action. Water |
|
|
1718
|
Tuesday, May 22, 2018, 10:02 |
Anders Mjos | Conditioning Station | Repair | | | Water leak from TK1 over the weekend | Link
to e-log,
Link |
  |
|
1720
|
Wednesday, May 23, 2018, 10:40 |
chad fisher | South Hot-Cell | Repair | TM4 | | Optics Tray Removal | The optics tray has been removed from TM4.
|
  |
|
1723
|
Thursday, May 24, 2018, 15:19 |
Keith C Ng | Assembly/Bench Test | Repair | TM2 | | tm 2 source tray build | Attached alignment check notes after brazing
and fabrication.
First page lower half shows establishment |
|
|
1726
|
Wednesday, May 30, 2018, 09:51 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 water lines helium pressure test at TCS. | I did a helium pressure test on TM2 water
lines at TCS. We will remove the TM2 source
tray soon so this test is a reference check |
|
|
1727
|
Wednesday, May 30, 2018, 09:55 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 and TCS vacuum pumps are switched off. | I switched off TM2 and TCS vacuum pumps.
The TCS and TM2 will be under vacuum without
pumping. |
|
|
1728
|
Thursday, May 31, 2018, 14:22 |
chad fisher | South Hot-Cell | Repair | TM4 | | Loop and beam shield | Tray with loop and beam shield has been
inserted into the hot cell to be installed
on TM4 . |
|
|
1729
|
Monday, June 04, 2018, 13:27 |
chad fisher | South Hot-Cell | Repair | TM4 | | Window Loop and Shield | The tray with window waterline loop and
EF Shield has been installed into TM4. |
|
|
1733
|
Friday, June 08, 2018, 11:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Removal Progress | The containment box has been removed from
TM2, the Enzel lens and steerers disconnected
and optics tray removal has commenced. |
|
|
1735
|
Monday, June 11, 2018, 11:30 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box on | Tm2 containment box has been re-installed
onto TM2. |
|
|
1736
|
Tuesday, June 12, 2018, 11:26 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM4 Optics Tray | I have "slung" the TM4 optics
tray in preparation for its removal. |
|
|
1738
|
Thursday, June 21, 2018, 17:15 |
Isaac Earle | North Hot-Cell | Development | | | Motorla CP200 radio with throat mic tested in NHC | A Motorla CP200 portable two-way
radio was tested today for use inside the
ISAC hot cells. A High Technology Communications |
|
|
1739
|
Friday, June 22, 2018, 13:59 |
chad fisher | South Hot-Cell | Repair | | | Soth Hot Cell Fields | Field measurements have been taken to determine
the level before entry for repair of manipulators.
Field on contact at manipulator is |
|