Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1697     Entry time: Monday, April 09, 2018, 06:36
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: ITW Turbo -pumps switch off 

I asked MCR to switch off ITW TP3,4 TP1s,2s this morning.

ELOG V2.9.2-2455