1723
|
Thursday, May 24, 2018, 15:19 |
Keith C Ng | Assembly/Bench Test | Repair | TM2 | | tm 2 source tray build | Attached alignment check notes after brazing
and fabrication.
First page lower half shows establishment |
|
|
1726
|
Wednesday, May 30, 2018, 09:51 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 water lines helium pressure test at TCS. | I did a helium pressure test on TM2 water
lines at TCS. We will remove the TM2 source
tray soon so this test is a reference check |
|
|
1727
|
Wednesday, May 30, 2018, 09:55 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 and TCS vacuum pumps are switched off. | I switched off TM2 and TCS vacuum pumps.
The TCS and TM2 will be under vacuum without
pumping. |
|
|
1728
|
Thursday, May 31, 2018, 14:22 |
chad fisher | South Hot-Cell | Repair | TM4 | | Loop and beam shield | Tray with loop and beam shield has been
inserted into the hot cell to be installed
on TM4 . |
|
|
1729
|
Monday, June 04, 2018, 13:27 |
chad fisher | South Hot-Cell | Repair | TM4 | | Window Loop and Shield | The tray with window waterline loop and
EF Shield has been installed into TM4. |
|
|
1733
|
Friday, June 08, 2018, 11:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Removal Progress | The containment box has been removed from
TM2, the Enzel lens and steerers disconnected
and optics tray removal has commenced. |
|
|
1735
|
Monday, June 11, 2018, 11:30 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box on | Tm2 containment box has been re-installed
onto TM2. |
|
|
1736
|
Tuesday, June 12, 2018, 11:26 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM4 Optics Tray | I have "slung" the TM4 optics
tray in preparation for its removal. |
|
|
1738
|
Thursday, June 21, 2018, 17:15 |
Isaac Earle | North Hot-Cell | Development | | | Motorla CP200 radio with throat mic tested in NHC | A Motorla CP200 portable two-way
radio was tested today for use inside the
ISAC hot cells. A High Technology Communications |
|
|
1739
|
Friday, June 22, 2018, 13:59 |
chad fisher | South Hot-Cell | Repair | | | Soth Hot Cell Fields | Field measurements have been taken to determine
the level before entry for repair of manipulators.
Field on contact at manipulator is |
|
|
1740
|
Monday, June 25, 2018, 11:31 |
chad fisher | South Hot-Cell | Standard Operation | | | Fields at Al cover | The shield door has been opened and fields
measured at 77 uSv/h on contact at the AL.
panel. |
|
|
1741
|
Monday, June 25, 2018, 16:42 |
Anders Mjos | Conditioning Station | Development | | | Testing new high current connectors | Shorted TGHT with new high current connector
assembly and heated to 600 A. Temperature
measured on half way point on cable ~ 70 |
|
|
1742
|
Tuesday, June 26, 2018, 08:56 |
chad fisher | South Hot-Cell | Standard Operation | | | South Hot Cell Fields | hot items have been moved and shielded
as much as possible. Field at left manipulator
has been reduced from 560 uSv/h to 85 uSv/h. |
|
|
1744
|
Friday, June 29, 2018, 10:12 |
chad fisher | South Hot-Cell | Maintenance | | | Manipulator Tong Cable Replacement | Tuesday, June 26 the broken tong cable
was replaced on the west manipulator in the
south hot cell. Wednesday the tong cable |
|
|
1745
|
Friday, June 29, 2018, 10:15 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | | TM2 work and target install | On Thursday, June 29th the containment
box of TM2 was removed and the optics tray
re-installed and reconnected. The box was |
|
|
1746
|
Friday, June 29, 2018, 10:27 |
chad fisher | South Hot-Cell | Maintenance | | | South Hot Cell Filter Change | At the end of manipulator repair Thursday
the ventilation pre-filter in the hot cell
was changed. Old filter remains in the hot |
|
|
1749
|
Tuesday, July 03, 2018, 14:38 |
David Wang | ITW | Standard Operation | | | ITW water signals interlock check. | Annual ITW water signals interlock check
are done. Everything works good. |
|
|
1755
|
Thursday, July 19, 2018, 09:17 |
chad fisher | South Hot-Cell | Repair | TM4 | | New Optics Tray Modification | The waterline loop bracket has been installed
onto the new loop holding bracket and both
installed onto the new source tray. |
|
|
1756
|
Thursday, July 19, 2018, 14:22 |
Isaac Earle | North Hot-Cell | Development | | | NHC diagnostic signals - connector and wiring details | Installation of the diagnostic connections
between the NHC hot and cold sides has been
completed. The cable bundle was prepared |
|
|
1761
|
Wednesday, August 01, 2018, 09:47 |
Isaac Earle | North Hot-Cell | Development | | | NHC diagnostic signals and control panel tested | On July 30th the NHC diagnostic
signals were tested:
- 9 pin CPC: a shorting plug was |
|