Friday, February 14, 2025, 10:48, David Wang, South Hot-Cell, Standard Operation, TM2, No target, TM2 has been moved from SHC to TCS.
Friday, February 14, 2025, 11:35, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 TP1/TP2 and TCS TP1S have been started at TCS.
Tuesday, February 18, 2025, 10:41, David Wang, Conditioning Station, Standard Operation, TM3, No target, TM2 at TCS annual electrical check and water lines helium pressure check .
Thursday, February 20, 2025, 10:12, David Wang, Safe Module Parking, Standard Operation, TM4, No target, TM4 electrical check at SMP(vented) without target
Thursday, February 20, 2025, 11:10, David Wang, Conditioning Station, Standard Operation, TM2, No target, TM2 has been moved from TCS to west-south silo.
Friday, February 21, 2025, 09:18, David Wang, Cooling, Standard Operation, , , HALCW pump ITC:MP1 and MP2 phase current draw measurement.
Monday, February 24, 2025, 11:15, David Wang, Cooling, Maintenance, , , ITW/ITE water system manual valves water small leak inspection and repairing.
Wednesday, February 26, 2025, 09:59, David Wang, South Hot-Cell, Standard Operation, , , SHC Field measurement from TH
Monday, March 03, 2025, 10:53, David Wang, ITE/ITW, Maintenance, , , ITH:MP1 has been replaced.
Monday, March 03, 2025, 15:33, David Wang, Cooling, Maintenance, , , HALCW resin can loop two filters have been replaced.
Friday, March 07, 2025, 09:07, David Wang, ITW, Standard Operation, , , ITW water signals interlock annual check is done.
Friday, March 07, 2025, 09:16, David Wang, Cooling, Maintenance, , , Service of 28 female Parker 1/4 quick connectors in ITW and ITE
Tuesday, March 11, 2025, 08:44, David Wang, ITW, Standard Operation, , , ITW:TP3,TP4, TP1S TP4S have been started since March 06th.
Tuesday, March 18, 2025, 13:54, David Wang, ITE, Standard Operation, , , ITE water signals interlock annual check
Thursday, March 20, 2025, 13:10, David Wang, Conditioning Station, Standard Operation, , , TCS water system filters annual replacement has been done.
Friday, April 04, 2025, 09:35, David Wang, Crane, Development, , , spent target pail and its lifting jigs load test
Thursday, April 24, 2025, 13:42, David Wang, Conditioning Station, Standard Operation, , , Refilled TCS:TK2 from 11" to 28.8 "
Monday, May 12, 2025, 09:17, David Wang, Facilities, Standard Operation, , , BL2A MAA ASU Test
Friday, June 06, 2025, 08:36, David Wang, Crane, Maintenance, , , TH crane main hoist B starting delay issue appears again.
Thursday, June 04, 2015, 07:44, Dan McDonald, Assembly/Bench Test, Development, TM2, , Movement of TM2 source tray to alignment area in ISAC