ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  2632   Thursday, July 04, 2024, 13:23 David WangSouth Hot-CellStandard OperationTM4UCx#45electrical check on TM4 UCx#45 target at SHC after operation. electrical check  on TM4 UCx#45 target
at SHC after operation is done.  
see attachment.
 Tm4_UCx_46_at_SHC_after_operatiom.pdf 
  2633   Friday, July 05, 2024, 12:50 David WangSouth Hot-CellStandard OperationTM4TiC#7TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation .TM4 and TiC#7 target electrical check and
HS leak check at SHC after target installation
have been done.  all results are good.
  
  2635   Monday, July 08, 2024, 10:40 David WangConditioning StationStandard OperationTM4TiC#7TM4 has been moved from SHC to TCS.TM4 has been moved from SHC to TCS. The
move is successfully. 
  
  2640   Tuesday, July 16, 2024, 11:15 David WangITWStandard OperationTM4TiC #7 febiad. TM4 has been moved from TCS to ITW. TM4 has been moved from TCS to ITW. 
the move is smooth. 
  
  2641   Tuesday, July 16, 2024, 11:15 David WangITWStandard OperationTM4TiC #7 febiad. TM4 has been moved from TCS to ITW. TM4 has been moved from TCS to ITW. 
the move is smooth.
  
  2647   Thursday, August 08, 2024, 11:41 David WangSouth Hot-CellStandard OperationTM3SiC #46Tm3 was moved from ITE to TCS this Tuesaday, then to SHC this morning.Tm3 was moved from ITE to TCS this Tuesday,
then to SHC  this morning. Both moves
are successful.
  
  2648   Thursday, August 08, 2024, 13:58 David WangSouth Hot-CellStandard OperationTM3SiC #46TM3 SiC#46 electrical check at SHC with target on (After operation)ABCD is short to 60KV bias. Othjer are
ok.  see attachment.
Found afterwards that this short
 TM3_Sic_46_after_run_E_check.pdf 
  2651   Friday, August 09, 2024, 18:18 David WangITWStandard OperationTM4TiC#7Tm4 has been moved from ITW to SMP.Tm4 has been moved from ITW to SMP. the
move is successful. 
  
  2652   Friday, August 09, 2024, 18:20 David WangITWStandard OperationTM3TiC#8TM3 has been moved from SHC to ITW.With TiC # 8 installed, TM3 has been moved
from SHc to ITW. The move is smooth. 
  
  2653   Friday, August 09, 2024, 19:01 David WangITWStandard OperationTM3TiC#8.TM3 has been connected in ITW.TM3 has been connected in ITW. See attachment
for checklist.
 TM3_TiC#8_connection_in_ITW_checklist.pdf 
  2658   Tuesday, August 13, 2024, 14:23 David WangITEStandard OperationTM3Ta#67.TM2 with Ta#target has been moved from SHC to ITE.TM2 with Ta#target has been moved from
SHC to ITE. the move is smooth. 
  
  2661   Friday, August 16, 2024, 09:50 David WangSouth Hot-CellStandard OperationTM4TiC #7 febiad.TM4 has been moved from SMP to SHC.TM4 has been moved from  SMP to SHC.
The move is smooth.
 
  
  2665   Monday, August 19, 2024, 09:32 David WangConditioning StationStandard OperationTM4Ta#68 TM4 has been moved from SHC to TCS.TM4 has been moved from SHC to TCS. The
move is successful. 
  
  2672   Tuesday, September 03, 2024, 11:40 David WangITWStandard OperationTM3TiC#8TM3 has been moved from ITW to S-W silo.TM3 has been moved from ITW to S-W silo.
The move is smooth. 
  
  2674   Friday, September 06, 2024, 10:01 David WangSouth Hot-CellStandard OperationTM4Ta#67 back up. TM4 has been moved from SMP to SHC.TM4 has been moved from SMP to SHC. The
move is smooth. 
  
  2678   Wednesday, September 11, 2024, 07:59 David WangConditioning StationStandard OperationTM4TiC#9TM4 has been moved from SHC to TCS.TM4 has been moved from SHC to TCS. The
move is smooth. 
  
  2683   Tuesday, September 17, 2024, 11:16 David WangITWStandard OperationTM4TiC#9TM4 has been moved from TCS to ITW.TM4 has been moved from TCS to ITW. The
move is smooth.
  
  2686   Wednesday, September 18, 2024, 13:47 David WangSouth Hot-CellStandard OperationTM3TiC#8Tm3 has been moved from silo to SHC.Tm3 has been moved  from silo to SHC.
The move is smooth. 
  
  2687   Monday, September 23, 2024, 11:26 David WangSouth Hot-CellStandard OperationTM3 TM3 window line has been leak checked. TM3 window line has been leak checked after
containment box removal and installation
for insulator installation on water cup C.  
  
  2688   Monday, September 23, 2024, 11:31 David WangSouth Hot-CellDevelopmentTM3 10 pins lectrical check result after insulator is installed on water cap C. 10 pins lectrical check result after insulator
is installed on water cap C. 
pin 14 to 60kv bias has 20 Kohm @250V
  