2672
|
Tuesday, September 03, 2024, 11:40 |
David Wang | ITW | Standard Operation | TM3 | TiC#8 | TM3 has been moved from ITW to S-W silo. |
TM3 has been moved from ITW to S-W silo. The move is smooth. |
|
2674
|
Friday, September 06, 2024, 10:01 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#67 back up. | TM4 has been moved from SMP to SHC. |
TM4 has been moved from SMP to SHC. The move is smooth. |
|
2678
|
Wednesday, September 11, 2024, 07:59 |
David Wang | Conditioning Station | Standard Operation | TM4 | TiC#9 | TM4 has been moved from SHC to TCS. |
TM4 has been moved from SHC to TCS. The move is smooth. |
|
2683
|
Tuesday, September 17, 2024, 11:16 |
David Wang | ITW | Standard Operation | TM4 | TiC#9 | TM4 has been moved from TCS to ITW. |
TM4 has been moved from TCS to ITW. The move is smooth. |
|
2686
|
Wednesday, September 18, 2024, 13:47 |
David Wang | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Tm3 has been moved from silo to SHC. |
Tm3 has been moved from silo to SHC. The move is smooth. |
|
2687
|
Monday, September 23, 2024, 11:26 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | TM3 window line has been leak checked. |
TM3 window line has been leak checked after containment box removal and installation for insulator installation on water cup C. No leak. |
|
2688
|
Monday, September 23, 2024, 11:31 |
David Wang | South Hot-Cell | Development | TM3 | | 10 pins lectrical check result after insulator is installed on water cap C. |
10 pins lectrical check result after insulator is installed on water cap C.
pin 14 to 60kv bias has 20 Kohm @250V Megga check. The rest check on ohmmeter and megga @250 are either OLor over 25Mohm which are good. |
|
2689
|
Monday, September 23, 2024, 11:35 |
David Wang | ITW | Standard Operation | TM4 | TiC #9. | vacuum leak check on TM4 service cap in ITW. |
vacuum leak check on TM4 service cap in ITW was done this morning. leak detector leak rate 0.0XE-9 atm.cc/sec. No leak on TM4 service cap module top. |
|
2692
|
Wednesday, September 25, 2024, 07:25 |
David Wang | Cooling | Maintenance | | | HALCW O2 level sensor maintenance. |
HALCW O2 level sensor annual maintenance is done. sensor membrane has been changed and electrolyte has been refilled. gauge is calibrated. It works normal after the job. |
|
2693
|
Wednesday, September 25, 2024, 09:12 |
David Wang | South Hot-Cell | Maintenance | TM3 | | Tm3 has been moved from SHC to silo. |
Tm3 has been moved from SHC to silo. the move is smooth. |
|
2694
|
Friday, September 27, 2024, 07:29 |
David Wang | Conditioning Station | Repair | | | TCS water system resistivity analyzer has been repaired. |
TCS water system resistivity analyzer has been repaired. Two diodes and one capacitor on PS board were broken. They were replaced. Installed analyzer back and tested it in system. it works fine. Operator closed e-fault, removed force on TS5, and enabled alarm on TS5 and TC1. |
|
2696
|
Tuesday, October 01, 2024, 10:55 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from ITE to SHC. |
TM2 has been moved from ITE to SHC. Peter did the move with Travis on help. The move is smooth. |
|
2699
|
Tuesday, October 08, 2024, 11:45 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Tm2 electrical check with Ta#68 installed at SHC. |
ABCD was dead shorted to 60kv bias during the first time measurement after target installation. Target was removed and reinstalled again with new VCR seals by Ferran. during target removal process, short disappeared when Aaron remove bolts on CD tube heaters terminal. leak check and electrical check result are good after second time target installation. |
Attachment 1: TM2_Ta#68_electrical_check.pdf
|
|
|
2700
|
Tuesday, October 08, 2024, 11:46 |
David Wang | ITE | Standard Operation | TM2 | Ta#68. | Tm2 has been moved form SHC to ITE. |
Tm2 has been moved form SHC to ITE. The move is smooth. |
|
2708
|
Thursday, October 24, 2024, 10:37 |
David Wang | Conditioning Station | Standard Operation | | | TCS water system functionnal test. |
TCS water system has been started for functional test. System parameters including pressure, all temperature sensors, flow rate sensors, resistivity are ok. I will watch on chiller CP1/2/3 in rest of the week and make sure chiller CP1/2/ 3 auto stage in/out work fine. |
|
2713
|
Wednesday, November 06, 2024, 16:33 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCX46 | TM4 with UCx46 electrical and leak check at SHC |
TM4 with UCx46 electrical and leak check at SHC is done. Everything is good. |
Attachment 1: TM4_UCx46_electrical_check.pdf
|
|
|
2730
|
Wednesday, December 04, 2024, 09:00 |
David Wang | Facilities | Standard Operation | TM2 | | all water lines on TM2 have been purged. |
all water lines on TM2 have been purged. Refilled them(except HS ) with 60psi nitrogen for module silo storage before next year using. |
|
2739
|
Friday, January 03, 2025, 10:41 |
David Wang | ITW | Standard Operation | TM4 | UCX46 | ITW primary and secondary vacuum vessel leak check for 2025 shut down |
ITW primary and secondary vacuum vessel leak check for 2025 shut down has been done. Also,TM4 internal water line helium pressure test has been finished. Both results are normal. There are two small old leak on EXit 1 and Exit2 module top plate o-ring under 1Xe-8 atm.cc/sec which we knoew in past years test. resin spray on leak area reduce the leak ratee below 5Xe-9 atm.cc/sec. No concern on these small leak. See attachment for detail results. |
Attachment 1: ITW_primary_and_secondary_vacuum_leak_check_2025.pdf
|
|
|
2742
|
Tuesday, January 07, 2025, 12:05 |
David Wang | ITE | Standard Operation | TM3 | UCx #47 | ITE primary and secondary vacuum vessel leak check for 2025 shut down |
ITE primary and secondary vacuum vessel leak check for 2025 shut down have been done. No leak. The TM3 waterlines helium pressure test will be done at TCS when module is there.
TM3 water lines helium pressure test are done. 70 psi helium 3 minutes to each line( except HS which has no target on it ) . leak detector base leak rate :0.0Xe-9 atm.cc/sec. No leak on all tested water lines.Helium were purged out after test. and 60 psi nitrogen were filled in lines for storage. |
|
2744
|
Thursday, January 09, 2025, 11:08 |
David Wang | Facilities | Maintenance | | | ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings |
ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings and investigation in pit. A fault 17644 has been issued. this pump will be replaced in March when general fielding in vacuum pit is reasonable for the job. |