  ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1155   Friday, February 19, 2016, 06:58 maicodallavalleSpent Target VaultMaintenance  F-308's serviced/loaded/ bolts torquedFive F-308's were loaded with spent ISAC
targets. All five F-308's were serviced two
weeks ago. All bolts were torqued and security 
  
  1156   Thursday, February 25, 2016, 06:48 David WangITEStandard Operation  4 Shielding blocks have been transferred from ITE to block storage area.Dan and I transferred 4 shielding blocks
from ITE to block storage area. The ITE pit
is opened now.
  
  1157   Thursday, February 25, 2016, 06:52 David WangConditioning StationStandard Operation  stop CS vacuum pumps.I stopped the conditioning station vacuum
pumps. The CS is still under vacuum without
venting.
  
  1163   Friday, March 04, 2016, 13:58 David WangConditioning StationStandard Operation  2016 Winter Shut Down Target Hall ScheduleUpdate Schedule according to changes.See
attachment1, 2.
 Re-post it after some minor
 8x 
  1164   Monday, March 14, 2016, 11:24 David WangITE/ITW CoolingMaintenance  HALCW resin tank filter cartridges are changed todayTwo of resin tank filter cartridges(supply
and return) are changed today. Old cartridges
and bagged and tagged. The contact field
 002.JPG003.JPG006.JPG 
  1172   Friday, March 18, 2016, 11:43 chad fisherSouth Hot-CellStandard Operation  SiC#32 dissectionSiC#32 has been open for inspection.  20160318_105519_1.jpg20160318_105311.jpg20160318_105248.jpg20160318_105428.jpg 
  1177   Tuesday, March 22, 2016, 10:27 Travis CaveSpent Target VaultStandard Operation SiC#32Spent Target moveSiC#32 has been moved from the south hot
cell to the spent target storage. See attached
PDF for details.
 Vault_Storage_March_22_2016.pdf 
  1183   Wednesday, March 30, 2016, 08:40 David WangConditioning StationStandard Operation  2016 Winter Shut Down Target Hall Scheduleupdate the schedule according to changes.See
attachment1, 2.
 2016_winter_shut_down__target_hall_schedule.pdf2016_winter_shut_down__target_hall_schedule.mpp 
  1200   Friday, April 08, 2016, 08:13 Anders MjosITE/ITW CoolingMaintenance  High Active Water ResistivityThe high active water resistivity took
a long time to recover after the upgrade
to the water cooling circuit. The system
 2016-04-08_ISAC_High_Active_Water_Resistivity.png 
  1201   Friday, April 08, 2016, 08:48 David WangITWStandard Operation  ITW water signal interlock check.I did a ITW water signals interlock check
with ISAC opp. They are checked once a year
before first beam on.
  
  1202   Friday, April 08, 2016, 13:16 David WangConditioning StationStandard Operation  2016 Winter Shut Down Target Hall ScheduleUpdate schedule weekly .see attachment
1,2
 2016_winter_shut_down__target_hall_schedule.mpp2016_winter_shut_down__target_hall_schedule.pdf 
  1204   Monday, April 11, 2016, 10:07 Travis CaveSpent Target VaultStandard Operation UC#14Spent Target moveThe spent UC#14 target has been moved into
the ISAC spent target vault. See the attached
PDF for the details.
 Vault_Storage_April_11_2016.pdf 
  1215   Monday, April 25, 2016, 12:18 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)Post MS project and Excel   
target hall schedule for beam schedule 130
see attachments 1,2
 7x 
  1221   Wednesday, May 04, 2016, 11:14 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Scope DecisionA meeting was held on May 4, 2016 to determine
the scope of the North Hot Cell project.
 The following was agreed upon by those
  
  1222   Wednesday, May 04, 2016, 12:01 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)Update schedule weekly. See attachment
1,2,3.
 Target_Hall_shedule_130_Apr_to_Sep_2016.pdfTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1233   Monday, May 16, 2016, 10:48 Anders MjosConditioning StationMaintenance  Topped up water in TCS:TK2 Filled from 15 to 25 in   
  1244   Tuesday, May 24, 2016, 10:52 Travis CaveSpent Target VaultStandard Operation UC#15Spent Target moveSpent UC#15 has been moved from the south
hot cell to the spent target storage. It
was placed in pail number 136, and placed
 Vault_Storage_May_24_2016.pdf 
  1262   Thursday, June 09, 2016, 10:04 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)Weekly update .  Target_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1266   Wednesday, June 15, 2016, 09:39 Travis CaveSpent Target VaultStandard Operation Ta#47Spent Target moveThe spent Ta#47 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail #137 in spot 4C of
 Vault_Storage_June_15_2016.pdf 
  1267   Tuesday, June 21, 2016, 13:47 Travis Cave/ Dan McDonaldSpent Target VaultRepair  Spent Target Vault DoorThe spent target vault door does not open
or close. The emergency door closing did
have to be used to close the door as it was
  