Wednesday, May 08, 2024, 12:37, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been moved form TCS to ITE
|
The move is smooth and successful. |
Friday, May 10, 2024, 09:04, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been connected in ITE.
|
Tm3 has been connected in ITE. see attachment. |
Monday, May 13, 2024, 09:28, David Wang, ITE, Standard Operation, TM4, UCx#44, ITE water signal annual interlock check.
|
ITE water signal annual interlock check is done. Ed helped me on this check. Everything works normal. |
Tuesday, May 21, 2024, 09:50, David Wang, ITW, Standard Operation, TM4, Lp Febiad empty, Tm4 has been disconnected in ITW.
|
Tm4 has been disconnected in ITW per document 141576. Checklist is done. HS line is purged. |
Tuesday, May 21, 2024, 11:46, David Wang, ITW, Standard Operation, TM4, LP febiad empty. , Tm4 has been moved from ITW to SHC.
|
Tm4 has been moved from ITW to SHC. the move is smooth. |
Wednesday, May 22, 2024, 12:32, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, TM4 has been moved from SHC to TCS.
|
TM4 has been moved from SHC to TCS. the move is smooth. |
Wednesday, May 22, 2024, 12:43, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, electrical check and leak check were done on TM4 UCx#45 target at SHC.
|
electrical check and leak check were done on TM4 UCx#45 target at SHC. everything is ok. See attachment
helium pressure test on TM4 HS line at TCS is done. No leak. |
Thursday, May 23, 2024, 11:10, David Wang, MAA, Standard Operation, , , BL2A MAA ASU test.
|
MCR Travis Curucz and I finished BL2A MAA ASU test per document 154779. everything works fine. Travis kept the test document. |
Tuesday, May 28, 2024, 07:45, David Wang, Conditioning Station, Standard Operation, TM4, UCx#45, TCS was argon vented this morning between 6:00 and 7:30am.
|
TCS was argon vented this morning between 6:00 and 7:30am for TM4 moving to ITW. |
Tuesday, May 28, 2024, 10:13, David Wang, ITW, Standard Operation, TM4, UCx#45, Tm4 has been moved from TCS to ITW.
|
Tm4 has been moved from TCS to ITW. the move is smooth. |
Thursday, May 30, 2024, 11:08, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 was moved from silo to TCS yesterday morning.
|
TM2 was moved from silo to TCS yesterday morning. The move is smooth. TCS vacuum system was started after. TCS and TM2 pumping down is ok so far. |
Wednesday, June 05, 2024, 11:25, David Wang, Conditioning Station, Standard Operation, , , refilled TCS:TK2 to 27.4 inches.
|
refilled TCS:TK2 to 27.4 inches to compensate water lost during THC filters change. |
Wednesday, June 05, 2024, 11:32, David Wang, Conditioning Station, Standard Operation, , , TCS water system filters have been changed.
|
TCS water system five filters were changed yesterday by plant group Dan.T. Service labels on filters are updated. No water leak after job. |
Wednesday, June 12, 2024, 10:18, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 is moved from TCS to silo this morning
|
TM2 is moved from TCS to silo this morning. The move is smooth. |
Thursday, June 13, 2024, 11:44, David Wang, Conditioning Station, Repair, TM2, , Replaced several o ring seals on TM2 service cap.
|
couple of E-8 to low E-7 atm.cc/sec leak were found on TM2 service cap top air to vacuum o rings. Replaced these leak o ring seals including o ring on IG1 and steerer service panel,o rings on MSP, EE, D blue nylon and copper feed through, and o ring on a round blank off beside MSP terminal on second row.
2024-july-03 update: TM2 was leak checked again at TCS. no air to vacuum leak on module top. i helium pressure tested(60psi) all water cooling lines (except HS) . They are leak free. |
Friday, June 14, 2024, 11:55, David Wang, South Hot-Cell, Standard Operation, TM3, UCx#44, TM3 UCx#44 after operation electrical check at SHC
|
TM3 UCx#44 after operation electrical check at SHC . see attachment.
Carla: Looks like the short on the cathode observed while trying to operate the FEBIAD in cathode-bias mode is still there. Will do investigations in the hot cell during disassembly. |
Friday, June 14, 2024, 11:56, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been moved form ITE to SHC.
|
Tm3 has been moved form ITE to SHC. the move is smooth. |
Monday, June 17, 2024, 07:36, David Wang, ITE, Repair, , , IG1S elbow oring seal and a blabk off cap oring seal beside the elbow were replaced on ITE entrance module top..
|
IG1S elbow o ring seal and a blank off cap o-ring seal beside the elbow were replaced on ITE entrance module top last Friday. IG1s has a higher than normal reading so i leak checked entrance module top last Thursday and found leaks to 5x E-8 atm.cc/sec leak on one of (or both of )these two o-rings seals. they are too close to identify exactly on which one was leaking so both o rings were replaced. other air to vacuum seal on entrance module are leak free. |
Tuesday, June 18, 2024, 11:59, David Wang, South Hot-Cell, Standard Operation, TM3, , Tm3 electrical check without target.
|
Tm3 electrical check without target is done. Everything is good including 2 x 5 pin connectors( all OL at 250 V to 60 KV and each other) see attachment. |
Wednesday, June 19, 2024, 08:10, David Wang, Waste Package/Ship, Development, , , 5 gallon spent target pail, spent target lifting long pole and hook assembly load test
|
5 gallon spent target pail, lifting long pole and hook assembly load test was done by Rupan, Keyur ,and David. Load in pail 101 lbs, test time 10 minutes. No deform on pail( pail OD 29.8mm is not changed before and after test. The test passed. Also 50 lbs load test on empty tray transit frame was done. The frame is good on test. Rupan will have a test report on this job. |
|