  1554   Thursday, June 08, 2017, 08:35 David WangConditioning StationDevelopmentTM2 TM2 gas line reconfiguration on the module top.Reconfigured TM2 gas line on the module
top. It matches with the febiad gas line
we are using on service tray now. Facing
 TM2_gas_line_on_the_top_002.JPG 
  1555   Friday, June 09, 2017, 11:21 chad fisherNorth Hot-CellMaintenance  Model 'N' Slave Removal Through RoofIsaac and Chad disengaged the slave end
of the manipulator and performed a slave
removal through the slave removal roof hatch.
  
  1556   Monday, June 12, 2017, 13:51 Travis CaveSpent Target VaultStandard Operation  Spent Target moveThe spent Ta#51 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail#149 and put in spot
 Vault_Storage_June_12_2017.pdf 
  1558   Tuesday, June 13, 2017, 11:10 Grant MinorCraneMaintenance  ISAC THall Crane 100% / 125% Load Test Documentation - 2011The ISAC Target Hall Crane was load tested
and re-certified in January 2011 prior to
doing a near-capacity lift for the North
 ISAC_TH_Crane_Load_Test_Norelco_Sept_30_2011.pdfIMG_8722.JPGIMG_8752.JPGIMG_8735.JPGIMG_8745.JPG 
  1559   Tuesday, June 13, 2017, 13:41 David WangITWStandard OperationTM2 TM2 has been connected in ITW.Yasmine and I connected TM2 in ITW today.
the control page is set to febiad mode. Both
gas line in ITW are opened for febiad run.
  
  1560   Thursday, June 15, 2017, 11:29 Isaac EarleNorth Hot-CellDevelopment  NHC inlet ducting installedThe North Hot Cell inlet ducting assembly
was installed today in the target hall at
the north end of the NHC roof block.  A
 IMG_0217.jpgIMG_0218.jpgIMG_0219.jpgIMG_0214.jpg 
  1561   Monday, June 19, 2017, 07:29 David WangConditioning StationStandard OperationTM2 Update TH MS project schedule.Update TH MS project schedule. See attachment
1,2. 
 Target_Hall_shedule_132_Apr_to_Sep.pdfTarget_Hall_shedule_132_Apr_to_Sep.mpp 
  1562   Thursday, June 22, 2017, 11:10 chad fisherSouth Hot-CellMaintenance  In cell airlineThe in cell airline has preemptively been
replaced. The hose was, as far as I know
the original.
  
  1563   Friday, June 23, 2017, 12:08 David WangCraneRepair  TH crane inspection and probem fixing by Gordon crane Gordon crane technician Peter came in today
and checked TH crane. Maico  and I were there
with him. What he found is that brake gap
  
  1564   Friday, June 23, 2017, 17:28 Isaac EarleNorth Hot-CellDevelopment  NHC module flange and cameras installed The North Hot Cell module support
flange (IRH1152D) was installed on June 21,
2017 using 1/8" rubber sheet as a sealing
 IMG_0231.jpgIMG_0234.jpgIMG_0240.jpgIMG_0245.jpgIMG_0240.jpg 
  1569   Tuesday, June 27, 2017, 14:34 David WangConditioning StationStandard OperationTM4 TM4 vacuum has been connected at TCSTurbo -pumps are started . The vacuum looks
good so far.
  
  1574   Thursday, June 29, 2017, 11:55 David WangConditioning StationRepair  TCS HV cable and feed through installationJohn Chow and I installed new TCS HV cable
and feed through with their mounting panel
back to TCS Faraday cage this Tuesday. ECO-4269
  
  1577   Wednesday, July 05, 2017, 15:36 Isaac EarleNorth Hot-CellDevelopment  NHC and SHC nuclear ventilation flow sensors installed Installation of new flow sensors
and transmitters for the NHC and SHC duct
lines was completed in the target hall today.
 IMG_0264.JPGIMG_0265.JPG 
  1578   Thursday, July 06, 2017, 14:23 Isaac EarleNorth Hot-CellRepair  Slave side Z motion tape snapped on NHC right side manipulatorThe NHC right side manipulator was evaluated
today to check if operation was normal through
all ranges of motion.  The manipulator
  
  1579   Monday, July 10, 2017, 09:09 Dan McDonaldNorth Hot-CellRepair  manipulator cart repairA  hydraulic leak was found on the
manipulator  install and repair cart,
upon further investigation the cause was
 IMG_2955.JPG 
  1580   Monday, July 10, 2017, 10:19 David WangConditioning StationStandard OperationTM4 Turned off TCS water systemPrepare for TM4 move tomorrow morning.   
  1582   Wednesday, July 12, 2017, 11:05 Anders MjosConditioning StationMaintenance  Testing of new high voltage cableThe target hall has been locked-out as
per Document-70039.
Forced IG1, IG1S and IG2 to switch
 2017-07-12_HV_Cable_Test.xlsx 
  1586   Tuesday, July 18, 2017, 15:04 Travis CaveCraneMaintenance  Failure of the ISAC TH Crane Rotate. Earlier in the day it was noted that
the rotate function of the crane had creased
operation. After David has finished the block
  
  1590   Wednesday, August 02, 2017, 15:09 David WangITWStandard OperationTM2 TM2 was disconnencted in ITW yesterday.Tm2 was disconnected in ITW yesterday.
ITW EL cable crimp ring was broken. John
Chow replaced this ring this afternoon.
  
  1591   Wednesday, August 02, 2017, 15:13 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.HS line is leak checked at SHC this afternoon
by helium spay.  Leak detector base
LR 0.0 XE-9atm.cc/sec. Base pressure 0.0Xe-4
  