2410
|
Wednesday, January 25, 2023, 06:52 |
David Wang | ITE | Standard Operation | TM4 | UCx#41 | ITE primary and secondary vacuum vessel air to vacuum seals leak check. | ITE primary and secondary vacuum vessel
air to vacuum seals leak check was done this
week. One leak has been found on IG1S feed |
|
2556
|
Wednesday, March 27, 2024, 09:52 |
David Wang | ITE | Standard Operation | | | ITE entrance module top and module flange o-ing to tank have been leak checked. | ITE entrance module top and module flange
o-ing to tank have been leak checked. no
leak at 0.0xe-9 atm.cc/sec. things are double |
|
2554
|
Monday, March 25, 2024, 10:55 |
David Wang | ITE | Standard Operation | | | ITE entrance module has been reconnected in ITE pit. | ITE entrance module has been reconnected
in ITE pit per document 190510. |
|
2553
|
Monday, March 25, 2024, 10:53 |
David Wang | ITE | Repair | | | ITE entrance module has been moved from TCS to ITE. | ITE entrance module has been moved from
TCS to ITE. The move is smooth. |
|
2550
|
Thursday, March 14, 2024, 14:54 |
David Wang | ITE | Maintenance | | | ITE entrance module has been moved from ITE pit to TCS. | ITE entrance module has been moved from
ITE pit to TCS. The move is smooth.ITE entrance
module top tank flange and o ring slot are |
|
2548
|
Friday, February 23, 2024, 06:36 |
David Wang | ITE | Maintenance | | | ITE entrance module has been disconnected. | ITE entrance module has been disconnected
per document 190510. Its a preparation job
for next month module moving out to SHC. |
|
658
|
Wednesday, May 07, 2014, 10:08 |
David Wang | ITE | Repair | TM3 | | ITE entrance module flange seal had been replaced. | ITE entrance module flange seal had been
replaced yesterday.The flange and the seal
groove were cleaned with Acetone before the |
7x |
1446
|
Tuesday, March 07, 2017, 14:41 |
David Wang | ITE | Maintenance | | | ITE dump plug water circuit is closed for ITE IG1S small surge. | It is closed @ 2:35PM by closing supply
side valve first , the return side valve
of ITE dump plug . |
|
1464
|
Monday, March 27, 2017, 06:33 |
David Wang | ITE | Standard Operation | | | ITE clean up | ITE clean up is done. HV cage inside
is wiped. |
|
1672
|
Tuesday, January 02, 2018, 11:28 |
David Wang | ITE | Standard Operation | TM4 | | ITE annual water interlock check. | Eric and I finished ITE annual water interlock
check. Everything works properly. |
|
1868
|
Friday, February 15, 2019, 12:05 |
David Wang | ITE | Maintenance | TM4 | | ITE annual vacuum leak check. | Helium pressure test on all water lines:
70psi , 3 minutes. HS has a quick response
to 9Xe-9atm.cc/sec for 20 seconds. No response |
|
2545
|
Thursday, February 15, 2024, 17:40 |
Carla Babcock | ITE | Standard Operation | | | ITE annual HV testing | ITE was set up for HV tests - this time
the module plug was not in so the BIAS and
EE had to be bypassed. NOTE: ITE:BIASPLC |
|
2176
|
Wednesday, January 06, 2021, 10:39 |
David Wang | ITE | Standard Operation | TM4 | | ITE and TM4 annual leak check. | Frank and I finished ITE and TM4 primary
and secondary vacuum vessel leak
check. LD bease leak rate 0.0x-9atm.cc/sec. No leak has been found.Also, All TM4 water lines have been pressurized with 70psi helium fro 3 minutes on each circuit. All water lines i |
|
1422
|
Wednesday, January 18, 2017, 09:55 |
David Wang | ITE | Standard Operation | TM4 | | ITE and TM4 2017 winter shut down leak check. | ITE and TM4 2017 winter shut down leak
check are finished. All ITE primary, secondary
vacuum vessel and TM4 water lines are good. |
|
67
|
Monday, January 09, 2012, 14:44 |
David Wang | ITE | Maintenance | TM4 | | ITE and TM4 2012 winter shut down leak check is completed. | I did a vacuum leak check on all ITE primary
vacuum vessel and secondary vessel.I also
did a helium pressure test(80psi ) on all |
|
2756
|
Wednesday, January 29, 2025, 09:06 |
David Wang | ITE/ITW | Standard Operation | | | ITE and ITW water system paddle wheels and coils on flow sensors have been replaced | ITE and ITW water system paddle wheels
and coils on all flow sensors in pits have
been replaced. It's a SAS job. |
|
733
|
Wednesday, August 13, 2014, 12:21 |
David Wang | ITE | Repair | TM4 | UCx10 | ITE TP4S is replaced | ITE TP4S was broken down last night . I
stopped the ITE pumps and vented station
with Argon this morning. Edi and I replaced |
|
1020
|
Tuesday, July 28, 2015, 10:17 |
David Wang | ITE | Repair | | | ITE TP4 has been replaced | Tony and I replaced the ITE TP4 turbo pump
today. The pumping time on controller has
been reset to 0. The replaced broken |
|
2108
|
Friday, June 19, 2020, 11:21 |
David Wang | ITE | Repair | TM4 | P2N test. | ITE TP3 is replaced. | ITE TP3 is replaced. ITE is under vacuum
again. All turbo pumps are started successfully.
Current draw on pumps are normal so far. |
|
549
|
Tuesday, November 19, 2013, 14:24 |
David Wang | ITE | Repair | | | ITE TP3 | Hi
all, The old ITE TP3 pump is
moved out and the new pump is in |
|