Entry  Tuesday, August 23, 2022, 11:33, Carla Babcock, ITE, Repair, , , ITE:ANODE swapped with TCS:ANODE 
ITE:ANODE supply reading strange currents - 17mA with the power supply on and no voltage. Checked anode circuit from electrical room:
Anode wire in electrical room shows 0L at 250V
Circuit with 50kOhm resistor mostly looks good (49-52kOhms) but a couple times read 28kOhms, no idea why. Tried jiggling all cables, unplugging
Entry  Monday, January 27, 2020, 10:40, David Wang, Cooling, Maintenance, , , ITE/ITW supply water presuure on dump circuits.  
With both stations in operation,ITE dump supply gauge reading is 27 psi. ITW is 20 Psi.  I adjusted ITW dump pressure to 25 psi by changing the
return line side pressure relieve valve.
ITE full operation+ ITW no TM: ITE dump pressure 27psi, ITW dump pressure 27psi.
Entry  Tuesday, January 25, 2022, 08:57, David Wang, ITE/ITW, Standard Operation, , , ITE/ITW have been cleaned with vacuum canister.  
ITE/ITW  are cleaned with vacuum canister. HV  cage inside and blue nylon insulators are wiped.  Garbage inside the pits are cleaned out.
Entry  Friday, February 15, 2019, 12:09, David Wang, ITE, Maintenance, TM4, , ITE water system maintenance. 
The ITE water system maintenance job is done. Changed all paddle wheels and coils on ITE flow sensors. All using water poly-tubes in ITE are replaced
.  Started high active water pump, and checked ITE water signals. They are good. No leak has been found on  replaced tubes and related fittings.
Entry  Tuesday, March 18, 2025, 13:54, David Wang, ITE, Standard Operation, , , ITE water signals interlock annual check 
ITE water signals interlock annual check is done today. all interlocks work . No issue. 
Entry  Wednesday, June 09, 2021, 10:15, David Wang, ITE/ITW, Standard Operation, TM4, UCX33. , ITE water signal interlock check.  
Annual ITE water signal interlock check is done.  HS, TAR, TUBE, MSP, EE, COIL 1, containment box window, HVC1, HVC2, 2A window, 2A  shielding
plug, 2A dump, 2A collimator, and 2A tank water signal interlock are checked.   Everything is working properly.  
2021-06-22. Annual ITW water signal interlock check is done,  HS, TAR, MSP,  EE, COIL1 , containment box window, HVC1 , HVC2, 2A window,
Entry  Tuesday, June 04, 2019, 08:46, David Wang, ITE, Standard Operation, TM2, , ITE water signal interlock check. 
ITE water signal interlock check is done. Everything is good. Coil 2   circuit no longer used in ITE . PQRU are looped as one circuit fro coil 1
circuit on Module since now. 
Entry  Wednesday, June 14, 2023, 13:37, David Wang, ITE, Standard Operation, TM4, , ITE water signal interlock check 
ITE water signal interlock check including HS,EE, TA, TU, MSP. Coil1 , C-window ,2a-window, 2A tank, 2A shielding plug , 2A dump, 2A collimator 
are done. All things work. 
Entry  Friday, January 10, 2020, 10:26, David Wang, ITE, Standard Operation, , , ITE water signal inerlock check. 
ITE water  signal interlock   check is done.  Everything is good. It is a annual check we do in winter shut down time. 
Entry  Monday, May 13, 2024, 09:28, David Wang, ITE, Standard Operation, TM4, UCx#44, ITE water signal annual interlock check. 
ITE water signal annual interlock check is done. Ed helped me on this check. Everything works normal. 
Entry  Tuesday, May 23, 2017, 14:10, David Wang, ITE, Standard Operation, , , ITE water interlock check is done. 
We do this check once a year now. Rene found a target oven reset issue during the check . He will consult with Friedhelm. The interlock check is good.
Entry  Thursday, March 11, 2021, 11:42, Frank Song, ITE, Maintenance, , , ITE water flow wheels and coils replacement. 
 ITE water flow wheels and coils are replaced. Wheels and coils on Oven, Tube, HS, EE, MSP,
Febiad coil, containment box window, dump, dump plug, 2A window, and tank return circuits are replaced with new parts.
Entry  Thursday, March 06, 2014, 06:58, David Wang, ITE, Maintenance, TM3, , ITE vacuum and leak check on ITE BL2A window flange. 
ITE and TM3 Turbo pumps have been started successfully yesterday. The vacuum reading on all ITE high vacuum gauges are at low E-6 range after one night
pumping down which are good so far. There is no any sign of leak on BL2A window and the flange seal on ITE side. Yesterday afternoon, Ron , Edi ,and I 
did a leak check on the ITE BL2A window flange(2aTunnel side). The leak detector was hooked onto BL2A in tunnel. Ron and I supplied helium from TH 
Entry  Tuesday, March 17, 2020, 14:59, David Wang, ITE, Development, TM4, P2N, ITE turbopumps are started. 
They work fine. Current draw on all pumps are normal. I asked operator to switch on IG1 , IG1S and PNG4. 
Entry  Monday, June 29, 2020, 10:09, David Wang, ITE, Standard Operation, TM4, P2N test., ITE turbo pumps are stopped 
ITE venting is in processing.
Entry  Monday, May 05, 2014, 13:05, David Wang, ITE, Repair, TM3, , ITE target module flange seal has been replaced. 004.JPG008.JPG008.JPG007.JPG
ITE target module flange seal has been replaced.The flan surface and the o-ring groove have been cleaned with Acetone before the new seal is installed.
See attached picture.
Entry  Wednesday, April 05, 2017, 11:57, David Wang, ITE, Maintenance, , , ITE target module flange o-ring repalcement 
ITE target module tank flange o-ring was replaced yesterday before TM4 moving. ITE: IG1S reading looks fine so far. 
Entry  Friday, July 30, 2021, 16:31, Carla Babcock, ITE, Repair, , , ITE re-wire ISK4425D-rev9._APshortmitigationsvg_july27update.png
See the attached for the way ITE has been re-wired for the Ta62 run. Note also that the copper block in the schematic on TBHT negative may not actually
be connected. Wiring verification on Aug. 4.
Entry  Wednesday, January 29, 2020, 12:37, David Wang, ITE, Standard Operation, TM2, , ITE primary/secondary vacuum vessel leak check. 
Leak check on ITE vacuum vessel is done. LD base leak rate 0.0XE-9atm.cc/sec. base pressure 0.0Xe-4torr. Sprayed helium on all ITE primary and secondary
vacuum vessel seals(including TM2). No leak . Also,70psi helium  pressurized TM2 waterlines inside the module for each circuit 3 minutes. No leak
on all operating TM2 waterlines.   
Entry  Monday, March 02, 2015, 10:52, David Wang, ITE, Maintenance, TM4, UCx, ITE primary and secondary vacuum vessels leak check. 
Dan and I leak checked ITE primary and secondary vacuum vessels with TM4  in ITE. The leak detector was hooked to ITE TP2 BV2. Leak detector 
base leak rate: 0.0xE-09 atm.cc/sec, base pressure: 0.0xE-4 torr. All secondary vacuum vessel seals has been checked(helium spray), and no leak has been
found. On the ITE primary vacuum vessel, we  leak checked every thing except the TM4 service cap and water lines inside the TM4. NO leak has been