  ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  733   Wednesday, August 13, 2014, 12:21 David WangITERepairTM4UCx10ITE TP4S is replacedITE TP4S was broken down last night . I
stopped the ITE pumps and vented station
with Argon this morning. Edi and I replaced
  
  1020   Tuesday, July 28, 2015, 10:17 David WangITERepair  ITE TP4 has been replacedTony and I replaced the ITE TP4 turbo pump
today. The pumping time on controller has
been reset to 0. The replaced broken 
  
  2108   Friday, June 19, 2020, 11:21 David WangITERepairTM4P2N test.ITE TP3 is replaced.ITE TP3 is replaced. ITE is under vacuum
again. All turbo pumps are started successfully.
Current draw on pumps are normal so far.
  
  549   Tuesday, November 19, 2013, 14:24 David WangITERepair  ITE TP3Hi
all, The old  ITE  TP3 pump is
moved out and the new pump is  in
  
  659   Wednesday, May 07, 2014, 10:15 David WangITERepairTM3 ITE TM3, entrance module and BL2A3 window flange seals leak check..ITE TM3, entrance module, and 2A3 window
flange seals have been leak checked this
morning after 2 new seals replacement.The
  
  189   Thursday, September 27, 2012, 09:13 David WangITERepairTM4 ITE MSP water circuit flow wheel had been replaced ITE MSP water circuit flow wheel was replaced
yesterday due to poor performance. 
  
  1447   Wednesday, March 08, 2017, 14:09 David WangITEMaintenanceTM2 ITE IG1S increasing.By retrieving data further, It has been
found no directly relationship between IG1S
surging and dump plug water opening. Vacuum
 ITE_IGIS_surge.pngITE_IG1S_and_PNG4.pngITE_IG1S_back_to_normal_overnight.pngITE_IG1S_behavior_from_Feb_08th_to_Mar_10th.png 
  2256   Wednesday, October 06, 2021, 10:42 David WangITERepair  ITE IG1S cable end connector replacementITE IG1S cable end connector replacement
has been finished by Roy Huang. 
  
  505   Wednesday, October 16, 2013, 18:53 Grant MinorITERepair  ITE Harp 9 Removed & Blanked-Off - blocks NOT YET replacedThe blocks above the pre-separator section
of the ISAC beam lines     were removed today
in the Target Hall by Bevan Moss and Chad
 11x 
  2180   Friday, January 22, 2021, 12:34 David WangITEStandard Operation  ITE HV test.ITE annual HV test is done. No module in
station. The bias power supply has been ramped
up to 49KV on control page. We still have
  
  2304   Thursday, February 10, 2022, 12:42 David WangITEStandard Operation  ITE HV test woithout mdoule was done.Carla
did the test. That is what she wrote in Feb
04th:  "I am done with the HV testing
  
  2075   Wednesday, March 04, 2020, 11:52 David WangITEStandard Operation  ITE HV test without moduleITE bias test is done to 48KV. No spark.
We can not raise bias above 48KV. It looks
like we have a current limit issue on control
  
  2435   Tuesday, May 02, 2023, 17:18 David WangITEStandard Operation  ITE 4 turbopumps are started for preoperation check. ITE TP3,4, 1S,and 4S were started successfully
this afternoon. All pump current draws 
were below 1.5A . IG1S was switched on. I
  
  2371   Monday, October 03, 2022, 14:28 Keith C NgAssembly/Bench TestMaintenance  ITA2826 rev E assemblyA fully built steerer sub assembly ITA2826
revision E was boxed and sealed and put on
rack storage in ISAC B2 South Hot Cell area.
  
  1636   Friday, October 06, 2017, 11:21 Isaac EarleNorth Hot-CellDevelopment  ISAC-1 active sump drain pipe modifiedThe 4" PVC drain line in the ISAC-1
active sump was modified so that the drain
pipe terminates below the low level water
 IMG_0513.jpgIMG_0516.jpgIMG_0517.jpg 
  1503   Tuesday, April 25, 2017, 19:35 Grant MinorCraneRepair  ISAC Target Hall Crane - West Hoist Brake Rattle

Normal
0




false
false
false
  
  1558   Tuesday, June 13, 2017, 11:10 Grant MinorCraneMaintenance  ISAC THall Crane 100% / 125% Load Test Documentation - 2011The ISAC Target Hall Crane was load tested
and re-certified in January 2011 prior to
doing a near-capacity lift for the North
 ISAC_TH_Crane_Load_Test_Norelco_Sept_30_2011.pdfIMG_8722.JPGIMG_8752.JPGIMG_8735.JPGIMG_8745.JPG 
  2584   Tuesday, May 07, 2024, 12:39 Eric LaheSpent Target VaultRepair  ISAC Storage Vault Re-alignment 
 Testing_and_updates_to_storage_vault_2024-05-01.pdf 
  2705   Friday, October 11, 2024, 15:59 Aaron TamFacilitiesRepair  ISAC B2 North Hot Cell Phone Fixed Resolution comment / Commentaire
de résolution:
    
  
  1599   Tuesday, August 15, 2017, 12:10 Isaac EarleNorth Hot-CellDevelopment  ISAC Active Sump low water level measuredThe ISAC active sump in the Active Service
Room (#002 on B2 level) was pumped out yesterday
using the standard procedure (Section 5.5.2
  