ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  871   Wednesday, March 25, 2015, 10:37 chad fisherSouth Hot-CellDevelopment  TM2 optics tray buildTM2 optics tray build is continuing. Going
well. Hope to have assembly and alignment
finished by Friday.
 20150325_101718.jpg20150325_101735.jpg20150325_102024.jpg 
  885   Monday, April 13, 2015, 08:59 David WangITEStandard Operation  Target Hall Scheduled Activities April 07 - June 26 2015See attachments 1, 2 for target hall schedule
from 07 April to 26 June 2015. The first
TM1 move which is scheduled on 16 April 2015
 Target_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.mpp 
  886   Wednesday, April 15, 2015, 09:01 Anders MjosConditioning StationDevelopment  Archiver variables added by Controls 
 
 
  
  903   Tuesday, April 28, 2015, 11:09 Anders MjosITWMaintenance  Resistance measured of TGHT and TBHT lines to ITWThe new TBHT and TGHT power supplies were
brough up to high current; 350 A and 420
A respectively. The TGHT power supply was
 Resistance_from_Electrical_Room_to_Target_Station.xlsx 
  909   Monday, May 04, 2015, 13:32 Anders MjosConditioning StationMaintenance  TK2 expansion tank topped upCaled cyclotron ops to open P23 and confirmed
penthouse valve open.
Filled up TK2 to 21 in water leve.
  
  913   Monday, May 11, 2015, 10:45 Anders MjosConditioning StationMaintenance  RGA electronics box installed The communications chip has been
replaced. The electronics box has been grounded
(see attached pdf).
 2015-05_RGA_GND_connection.pdf 
  930   Wednesday, June 03, 2015, 11:22 David WangConditioning StationStandard Operation  Target Hall Scheduled Activities April 07 - July 21 2015I revised the Target Hall schedule to July
21 2015. It is the time new TM2 with ZrC
target started at ITW.
 Target_Hall_Scheduled_Activities__Apr_07_to_July_21__2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.mpp 
  945   Friday, June 12, 2015, 13:27 David WangSouth Hot-CellStandard Operation  TM2 new source tray has been remotely transferred from TH into SHC successfully.TM2 new source tray has been remotely transferred
into SHC successfully. The transfer table
has been moved back to TH within 1 hour. 
  
  948   Monday, June 15, 2015, 14:14 David WangSouth Hot-CellStandard Operation  Target Hall Scheduled Activities April 07 - July 21 2015Weekly update Target Hall schedule 2015-06-15.
See attachment 1,2
 2015-06-19, Update the schedule
 Target_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.pdf 
  957   Tuesday, June 23, 2015, 10:55 chad fisherSouth Hot-CellRepair  Left Manipulator RepairThe master wrist/tong cable has been replaced
on the left manipulator. Everything appears
to function well so far.
  
  959   Tuesday, June 23, 2015, 16:49 Anders MjosConditioning StationDevelopment  TCS is beeing migrated to ISACby controls group (Dave Morris).

Friday, June 26, 2015
TCS has been migrated to ISAC controls.
  
  968   Tuesday, June 30, 2015, 09:47 chad fisherSouth Hot-CellRepair  manipulator repairThe right hand manipulator has been repaired.
It took 43 minutes and I received ~ 0.56
mSv
  
  975   Thursday, July 02, 2015, 11:51 Travis CaveSpent Target VaultStandard Operation UC#12Spent target movedUC#12 has been moved from the south hot
cell and placed into storage. It is in pail
#125 and in spot 1C of the vault it had a
 Vault_Storage_July_2_2015.pdf 
  977   Friday, July 03, 2015, 09:27 Anders MjosConditioning StationDevelopment  Controls working on access control in EPICS Some reboots will be done.   
  981   Tuesday, July 07, 2015, 10:50 Anders MjosConditioning StationDevelopment  EPICS migration update - archiver
    The archiver is now merged with
ISAC - data available under Utilities
- Archiver Retrieval
    Old
  
  982   Tuesday, July 07, 2015, 12:12 David WangConditioning StationRepair  CS TP1S replacementCS TP1S had been replaced with a new TP-301
pump this morning.The old pump was broken
last week.
  
  999   Thursday, July 16, 2015, 07:38 David WangITEStandard Operation  Target Hall Scheduled Activities April 07 - August 07 2015Update the TH schedule according to present
TM2 refurbishment process. See attachments
1,2
 Target_Hall_Scheduled_Activities__Apr_07_to_Aug_07.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_07.mppTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mpp 
  1006   Tuesday, July 21, 2015, 12:29 David WangITEMaintenance  target pit Hepa filterTarget pit Hepa filter has been replaced
today. There is 500 counts on swipe which
is taken inside of the replaced filter. The
  
  1007   Tuesday, July 21, 2015, 12:38 David WangITWRepair  ITW external water leak on dump circuit has been fixed.The leaking 1/8 NPT(M)-1/4NPT(F) adapter
on the ITW dump circuit is replaced.
  
  1010   Thursday, July 23, 2015, 10:23 David WangITEStandard Operation  Target Hall Scheduled Activities April 07 - August 019 2015Update Target Hall schedule after the changing
on TM2 process. See attachment 1,2
 Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mpp 