1869
|
Friday, February 15, 2019, 12:09 |
David Wang | ITE | Maintenance | TM4 | | ITE water system maintenance. | The ITE water system maintenance job is
done. Changed all paddle wheels and coils
on ITE flow sensors. All using water poly-tubes |
|
2785
|
Tuesday, March 18, 2025, 13:54 |
David Wang | ITE | Standard Operation | | | ITE water signals interlock annual check | ITE water signals interlock annual check
is done today. all interlocks work . No issue.
|
|
2225
|
Wednesday, June 09, 2021, 10:15 |
David Wang | ITE/ITW | Standard Operation | TM4 | UCX33. | ITE water signal interlock check. | Annual ITE water signal interlock check
is done. HS, TAR, TUBE, MSP, EE, COIL
1, containment box window, HVC1, HVC2, 2A |
|
1932
|
Tuesday, June 04, 2019, 08:46 |
David Wang | ITE | Standard Operation | TM2 | | ITE water signal interlock check. | ITE water signal interlock check is done.
Everything is good. Coil 2 circuit
no longer used in ITE . PQRU are looped as |
|
2459
|
Wednesday, June 14, 2023, 13:37 |
David Wang | ITE | Standard Operation | TM4 | | ITE water signal interlock check | ITE water signal interlock check including
HS,EE, TA, TU, MSP. Coil1 , C-window ,2a-window,
2A tank, 2A shielding plug , 2A dump, 2A |
|
2046
|
Friday, January 10, 2020, 10:26 |
David Wang | ITE | Standard Operation | | | ITE water signal inerlock check. | ITE water signal interlock
check is done. Everything is good.
It is a annual check we do in winter shut |
|
2590
|
Monday, May 13, 2024, 09:28 |
David Wang | ITE | Standard Operation | TM4 | UCx#44 | ITE water signal annual interlock check. | ITE water signal annual interlock check
is done. Ed helped me on this check. Everything
works normal. |
|
1548
|
Tuesday, May 23, 2017, 14:10 |
David Wang | ITE | Standard Operation | | | ITE water interlock check is done. | We do this check once a year now. Rene
found a target oven reset issue during the
check . He will consult with Friedhelm. The |
|
2198
|
Thursday, March 11, 2021, 11:42 |
Frank Song | ITE | Maintenance | | | ITE water flow wheels and coils replacement. | ITE water flow wheels
and coils are replaced. Wheels and coils |
|
613
|
Thursday, March 06, 2014, 06:58 |
David Wang | ITE | Maintenance | TM3 | | ITE vacuum and leak check on ITE BL2A window flange. | ITE and TM3 Turbo pumps have been started
successfully yesterday. The vacuum reading
on all ITE high vacuum gauges are at low |
|
2088
|
Tuesday, March 17, 2020, 14:59 |
David Wang | ITE | Development | TM4 | P2N | ITE turbopumps are started. | They work fine. Current draw on all pumps
are normal. I asked operator to switch on
IG1 , IG1S and PNG4. |
|
2113
|
Monday, June 29, 2020, 10:09 |
David Wang | ITE | Standard Operation | TM4 | P2N test. | ITE turbo pumps are stopped | ITE venting is in processing. |
|
655
|
Monday, May 05, 2014, 13:05 |
David Wang | ITE | Repair | TM3 | | ITE target module flange seal has been replaced. | ITE target module flange seal has been
replaced.The flan surface and the o-ring
groove have been cleaned with Acetone before |
   |
1479
|
Wednesday, April 05, 2017, 11:57 |
David Wang | ITE | Maintenance | | | ITE target module flange o-ring repalcement | ITE target module tank flange o-ring was
replaced yesterday before TM4 moving. ITE:
IG1S reading looks fine so far. |
|
2237
|
Friday, July 30, 2021, 16:31 |
Carla Babcock | ITE | Repair | | | ITE re-wire | See the attached for the way ITE has been
re-wired for the Ta62 run. Note also that
the copper block in the schematic on TBHT |
|
2053
|
Wednesday, January 29, 2020, 12:37 |
David Wang | ITE | Standard Operation | TM2 | | ITE primary/secondary vacuum vessel leak check. | Leak check on ITE vacuum vessel is done.
LD base leak rate 0.0XE-9atm.cc/sec. base
pressure 0.0Xe-4torr. Sprayed helium on all |
|
851
|
Monday, March 02, 2015, 10:52 |
David Wang | ITE | Maintenance | TM4 | UCx | ITE primary and secondary vacuum vessels leak check. | Dan and I leak checked ITE primary and
secondary vacuum vessels with TM4 in
ITE. The leak detector was hooked to ITE |
|
2286
|
Monday, January 10, 2022, 09:31 |
David Wang | ITE | Standard Operation | TM4 | | ITE primary and secondary vacuum vessel leak check. | ITE primary and secondary vacuum
vessel leak check has been down. Base
leak rate 0.0x E-9 atm.cc/sec on LD. Only |
|
2537
|
Friday, February 02, 2024, 07:48 |
David Wang | ITE | Standard Operation | TM4 | | ITE primary and secondary vacuum vessel leak check. | ITE primary and secondary vacuum vessel
leak check has been done. SST bellow for
2A3M19 wire scanner on entrance module |
|
2742
|
Tuesday, January 07, 2025, 12:05 |
David Wang | ITE | Standard Operation | TM3 | UCx #47 | ITE primary and secondary vacuum vessel leak check for 2025 shut down | ITE primary and secondary vacuum vessel
leak check for 2025 shut down have been done.
No leak. The TM3 waterlines helium |
|