ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
733
|
Wednesday, August 13, 2014, 12:21 |
David Wang | ITE | Repair | TM4 | UCx10 | ITE TP4S is replaced | ITE TP4S was broken down last night . I
stopped the ITE pumps and vented station
with Argon this morning. Edi and I replaced |
|
1020
|
Tuesday, July 28, 2015, 10:17 |
David Wang | ITE | Repair | | | ITE TP4 has been replaced | Tony and I replaced the ITE TP4 turbo pump
today. The pumping time on controller has
been reset to 0. The replaced broken |
|
2108
|
Friday, June 19, 2020, 11:21 |
David Wang | ITE | Repair | TM4 | P2N test. | ITE TP3 is replaced. | ITE TP3 is replaced. ITE is under vacuum
again. All turbo pumps are started successfully.
Current draw on pumps are normal so far. |
|
549
|
Tuesday, November 19, 2013, 14:24 |
David Wang | ITE | Repair | | | ITE TP3 | Hi
all, The old ITE TP3 pump is
moved out and the new pump is in |
|
659
|
Wednesday, May 07, 2014, 10:15 |
David Wang | ITE | Repair | TM3 | | ITE TM3, entrance module and BL2A3 window flange seals leak check.. | ITE TM3, entrance module, and 2A3 window
flange seals have been leak checked this
morning after 2 new seals replacement.The |
|
189
|
Thursday, September 27, 2012, 09:13 |
David Wang | ITE | Repair | TM4 | | ITE MSP water circuit flow wheel had been replaced | ITE MSP water circuit flow wheel was replaced
yesterday due to poor performance. |
|
1447
|
Wednesday, March 08, 2017, 14:09 |
David Wang | ITE | Maintenance | TM2 | | ITE IG1S increasing. | By retrieving data further, It has been
found no directly relationship between IG1S
surging and dump plug water opening. Vacuum |
|
2256
|
Wednesday, October 06, 2021, 10:42 |
David Wang | ITE | Repair | | | ITE IG1S cable end connector replacement | ITE IG1S cable end connector replacement
has been finished by Roy Huang. |
|
505
|
Wednesday, October 16, 2013, 18:53 |
Grant Minor | ITE | Repair | | | ITE Harp 9 Removed & Blanked-Off - blocks NOT YET replaced | The blocks above the pre-separator section
of the ISAC beam lines were removed today
in the Target Hall by Bevan Moss and Chad |
11x |
2180
|
Friday, January 22, 2021, 12:34 |
David Wang | ITE | Standard Operation | | | ITE HV test. | ITE annual HV test is done. No module in
station. The bias power supply has been ramped
up to 49KV on control page. We still have |
|
2304
|
Thursday, February 10, 2022, 12:42 |
David Wang | ITE | Standard Operation | | | ITE HV test woithout mdoule was done. | Carla
did the test. That is what she wrote in Feb
04th: "I am done with the HV testing |
|
2075
|
Wednesday, March 04, 2020, 11:52 |
David Wang | ITE | Standard Operation | | | ITE HV test without module | ITE bias test is done to 48KV. No spark.
We can not raise bias above 48KV. It looks
like we have a current limit issue on control |
|
2435
|
Tuesday, May 02, 2023, 17:18 |
David Wang | ITE | Standard Operation | | | ITE 4 turbopumps are started for preoperation check. | ITE TP3,4, 1S,and 4S were started successfully
this afternoon. All pump current draws
were below 1.5A . IG1S was switched on. I |
|
2371
|
Monday, October 03, 2022, 14:28 |
Keith C Ng | Assembly/Bench Test | Maintenance | | | ITA2826 rev E assembly | A fully built steerer sub assembly ITA2826
revision E was boxed and sealed and put on
rack storage in ISAC B2 South Hot Cell area. |
|
1636
|
Friday, October 06, 2017, 11:21 |
Isaac Earle | North Hot-Cell | Development | | | ISAC-1 active sump drain pipe modified | The 4" PVC drain line in the ISAC-1
active sump was modified so that the drain
pipe terminates below the low level water |
|
1503
|
Tuesday, April 25, 2017, 19:35 |
Grant Minor | Crane | Repair | | | ISAC Target Hall Crane - West Hoist Brake Rattle |
Normal
0
false
false
false
|
|
1558
|
Tuesday, June 13, 2017, 11:10 |
Grant Minor | Crane | Maintenance | | | ISAC THall Crane 100% / 125% Load Test Documentation - 2011 | The ISAC Target Hall Crane was load tested
and re-certified in January 2011 prior to
doing a near-capacity lift for the North |
|
2584
|
Tuesday, May 07, 2024, 12:39 |
Eric Lahe | Spent Target Vault | Repair | | | ISAC Storage Vault Re-alignment |
|
|
2705
|
Friday, October 11, 2024, 15:59 |
Aaron Tam | Facilities | Repair | | | ISAC B2 North Hot Cell Phone Fixed | Resolution comment / Commentaire
de résolution:
|
|
1599
|
Tuesday, August 15, 2017, 12:10 |
Isaac Earle | North Hot-Cell | Development | | | ISAC Active Sump low water level measured | The ISAC active sump in the Active Service
Room (#002 on B2 level) was pumped out yesterday
using the standard procedure (Section 5.5.2 |
|