2407
|
Tuesday, January 24, 2023, 07:26 |
David Wang | Conditioning Station | Standard Operation | | | TH floor moping and garbage collelctions. | Plant group and us finished TH floor
mopping and garbage collections last Wednesday.
Th moping head had 800 count after using. |
|
|
2408
|
Tuesday, January 24, 2023, 08:46 |
David Wang | ITE | Standard Operation | TM4 | UCx#41 | TM4 has been disconnected in ITE. | TM 4 has been disconnected in ITE.
See attachment for disconnection checklist. |
|
|
2409
|
Tuesday, January 24, 2023, 14:22 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#41 | TM4 electrical check with and without target at SHC | TM4 electrical check with UCX41target and
without target at SHC. The results
are good. See attachment. |
|
|
2410
|
Wednesday, January 25, 2023, 06:52 |
David Wang | ITE | Standard Operation | TM4 | UCx#41 | ITE primary and secondary vacuum vessel air to vacuum seals leak check. | ITE primary and secondary vacuum vessel
air to vacuum seals leak check was done this
week. One leak has been found on IG1S feed |
|
|
2411
|
Friday, January 27, 2023, 07:11 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. | Tom Kauss inspected target hall crane yesterday.
The crane works fine. Tom has this inspection
record in his file. The inspection tag has |
|
|
2412
|
Friday, January 27, 2023, 07:15 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. | Tom Kauss finished TH crane annual
inspection yesterday. The crane woks fine.
Tom has this inspection record in his file. |
|
|
2413
|
Friday, January 27, 2023, 07:18 |
David Wang | Crane | Standard Operation | | | Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02 | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02
yesterday. He certified the use of these |
|
|
2414
|
Friday, January 27, 2023, 07:25 |
David Wang | Crane | Standard Operation | | | Inspection of TH crane below hook attachment pins and plates ITA6550-01 | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01
yesterday. He certified the use of these |
|
|
2416
|
Monday, February 13, 2023, 09:57 |
David Wang | ITW | Maintenance | | | ITW/ITE primary vacuum back up lines and BVs leak check in target pit. | In past two weeks, ITW/ ITE primary vacuum
back up lines and BVs in ITW/ITE pit have
been leak checked. ITW BV1 and BV2 |
|
|
2417
|
Tuesday, February 14, 2023, 11:36 |
David Wang | Assembly/Bench Test | Repair | | | Turbo pump BVs o-ring replacement. | Five of used internal leaked
TP BVs are serviced and repaired. Internal
plunge o-ring and case o-ring are replaced |
|
|
2419
|
Wednesday, March 01, 2023, 09:27 |
David Wang | Cooling | Maintenance | | | Two filters on HALCW resin circuit have been replaced. | Two filters on HALCW resin circuit have
been replaced. O-ring 235# were changed on
both filter cartridge houses. 25micron |
|
|
2420
|
Wednesday, March 01, 2023, 09:34 |
David Wang | Cooling | Maintenance | | | Visual inspection of HALCW for possible small water leak or drip. | I visually inspected HALCW system including
water station section, both target pits,
and de-ionizer system. No small leak |
|
|
2421
|
Wednesday, March 01, 2023, 10:01 |
David Wang | ITE/ITW | Development | | | vacuum pit ventilation upgrade. | vacuum pit ventilation upgrade was done
last week. The jobs include: installed two
industrial cooling fans. One |
|
|
2424
|
Wednesday, March 08, 2023, 06:32 |
David Wang | Cooling | Maintenance | | | HALCW flow sensors replacement. | HALCW flow sensors replacement job is done.
All ITE/ITW(except ITE HS) return line water
flow sensors including paddle wheels and |
|
|
2425
|
Wednesday, March 08, 2023, 09:19 |
David Wang | Cooling | Standard Operation | | | HALCW ITC:MP1/MP2 motor phase current measurement. | HALCW ITC:MP1/MP2 motor phase current measurement
is done by Joel from electrician group. MP1:17.1A/17.2A/16.7A.
MP2: 17.9A/17.9A/17.3A. 19.5A |
|
|
2426
|
Wednesday, March 08, 2023, 13:57 |
David Wang | Cooling | Standard Operation | | | HALCW ITC:MP1/MP2 pump and motor temerature measurements | HALCW ITC:MP1/MP2 pump and motor temperature
measurements result:
MP1: pump discharging port: |
|
|
2433
|
Monday, April 24, 2023, 10:18 |
David Wang | Cooling | Maintenance | | | HALCW flowmeter transmotters inspetion and calibration. | ITW, ITE, ITW +ITE total , and low active
cooling water return flow meter transmitters
are inspected and calibrated. Result: |
|
|
2434
|
Friday, April 28, 2023, 21:39 |
David Wang | Conditioning Station | Standard Operation | | | TCS cooling water system was started and tested this Wednesday | TCS cooling water system was started and
tested this Wednesday. Chiller compressor
2 and 3 was in operation cycle twice without |
|
|
2435
|
Tuesday, May 02, 2023, 17:18 |
David Wang | ITE | Standard Operation | | | ITE 4 turbopumps are started for preoperation check. | ITE TP3,4, 1S,and 4S were started successfully
this afternoon. All pump current draws
were below 1.5A . IG1S was switched on. I |
|
|
2437
|
Wednesday, May 03, 2023, 13:22 |
David Wang | ITE | Standard Operation | | | Argon vented ITE station. | Argon vented ITE station. ITEVV1S and ITGT
SV3 were closed after venting. |
|