Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 105 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  2053   Wednesday, January 29, 2020, 12:37 David WangITEStandard OperationTM2 ITE primary/secondary vacuum vessel leak check.Leak check on ITE vacuum vessel is done.
LD base leak rate 0.0XE-9atm.cc/sec. base
pressure 0.0Xe-4torr. Sprayed helium on all
  
  851   Monday, March 02, 2015, 10:52 David WangITEMaintenanceTM4UCxITE primary and secondary vacuum vessels leak check.Dan and I leak checked ITE primary and
secondary vacuum vessels with TM4  in
ITE. The leak detector was hooked to ITE
  
  2286   Monday, January 10, 2022, 09:31 David WangITEStandard OperationTM4 ITE primary and secondary vacuum vessel leak check. ITE primary and secondary  vacuum
vessel leak check has been down.  Base
leak rate 0.0x E-9 atm.cc/sec on LD. Only
  
  2537   Friday, February 02, 2024, 07:48 David WangITEStandard OperationTM4 ITE primary and secondary vacuum vessel leak check. ITE primary and secondary vacuum vessel
leak check has been done. SST bellow for
2A3M19  wire scanner on entrance module
  
  2742   Tuesday, January 07, 2025, 12:05 David WangITEStandard OperationTM3UCx #47ITE primary and secondary vacuum vessel leak check for 2025 shut downITE primary and secondary vacuum vessel
leak check for 2025 shut down have been done.
No leak.  The TM3 waterlines helium
  
  2410   Wednesday, January 25, 2023, 06:52 David WangITEStandard OperationTM4UCx#41ITE primary and secondary vacuum vessel air to vacuum seals leak check. ITE primary and secondary vacuum vessel
air to vacuum seals leak check was done this
week. One leak has been found on IG1S feed
 ITE_vacuum_vessel_leak_check_2023..pdf 
  2556   Wednesday, March 27, 2024, 09:52 David WangITEStandard Operation  ITE entrance module top and module flange o-ing to tank have been leak checked.ITE entrance module top and module flange
o-ing to tank have been leak checked. no
leak at 0.0xe-9 atm.cc/sec. things are double
  
  2554   Monday, March 25, 2024, 10:55 David WangITEStandard Operation  ITE entrance module has been reconnected in ITE pit. ITE entrance module has been reconnected
in ITE pit per document 190510. 
  
  2553   Monday, March 25, 2024, 10:53 David WangITERepair  ITE entrance module has been moved from TCS to ITE.ITE entrance module has been moved from
TCS to ITE. The move is smooth. 
  
  2550   Thursday, March 14, 2024, 14:54 David WangITEMaintenance  ITE entrance module has been moved from ITE pit to TCS. ITE entrance module has been moved from
ITE pit to TCS. The move is smooth.ITE entrance
module top tank flange and o ring slot are
  
  2548   Friday, February 23, 2024, 06:36 David WangITEMaintenance  ITE entrance module has been disconnected.ITE entrance module has been disconnected
per document 190510. Its a preparation job
for next month module moving out to SHC.
  
  658   Wednesday, May 07, 2014, 10:08 David WangITERepairTM3 ITE entrance module flange seal had been replaced.ITE entrance module flange seal had been
replaced yesterday.The flange and the seal
groove were cleaned with Acetone before the
 7x 
  1446   Tuesday, March 07, 2017, 14:41 David WangITEMaintenance  ITE dump plug water circuit is closed for ITE IG1S small surge.It is closed @ 2:35PM by closing supply
side valve first , the return side valve
of ITE dump plug .
  
  1464   Monday, March 27, 2017, 06:33 David WangITEStandard Operation  ITE clean upITE clean up is done.  HV cage inside
is wiped.
  
  1672   Tuesday, January 02, 2018, 11:28 David WangITEStandard OperationTM4 ITE annual water interlock check.Eric and I finished ITE annual water interlock
check. Everything works properly.
  
  1868   Friday, February 15, 2019, 12:05 David WangITEMaintenanceTM4 ITE annual vacuum leak check. Helium pressure test on all water lines:
70psi , 3 minutes. HS has a quick response
to 9Xe-9atm.cc/sec for 20 seconds. No response
  
  2545   Thursday, February 15, 2024, 17:40 Carla BabcockITEStandard Operation  ITE annual HV testingITE was set up for HV tests - this time
the module plug was not in so the BIAS and
EE had to be bypassed. NOTE: ITE:BIASPLC
  
  2176   Wednesday, January 06, 2021, 10:39 David WangITEStandard OperationTM4 ITE and TM4 annual leak check.Frank and I finished ITE and TM4 primary
and secondary  vacuum vessel  leak
check. LD bease leak rate 0.0x-9atm.cc/sec. No leak has been found.Also, All TM4 water lines  have been pressurized with 70psi helium fro 3 minutes on each circuit. All water lines i
  
  1422   Wednesday, January 18, 2017, 09:55 David WangITEStandard OperationTM4 ITE and TM4 2017 winter shut down leak check.ITE and TM4 2017 winter shut down leak
check are finished. All ITE primary, secondary
vacuum vessel and TM4 water lines are good.
  
  67   Monday, January 09, 2012, 14:44 David WangITEMaintenanceTM4 ITE and TM4 2012 winter shut down leak check is completed.I did a vacuum leak check on all ITE primary
vacuum vessel and secondary vessel.I also
did a helium pressure test(80psi ) on all
  
ELOG V2.9.2-2455