  RH-ISAC, Page 104 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  1696   Thursday, April 05, 2018, 11:29 David WangITWMaintenance  ITH MP1 replacementITH MP1 is replaced today with a new style
pump.The new pump is 0.75 inch higher than 
old pump on inlet and exhaust so a new solid
  
  244   Thursday, February 14, 2013, 09:31 David WangITWRepair  ITH MP1 is replaced.Edi and I replaced the broken ITH MP1 in
target hall with a new pump. The old pump
was leak on oil. There were no oil had been
  
  2189   Thursday, February 18, 2021, 12:33 David WangITERepair  ITE:TP1SITE TP1S new pump is installed today. Reset
pump life time on controller to 0 hr. 
  
  2360   Tuesday, August 23, 2022, 11:33 Carla BabcockITERepair  ITE:ANODE swapped with TCS:ANODEITE:ANODE supply reading strange currents
- 17mA with the power supply on and no voltage.
Checked anode circuit from electrical room:
  
  2052   Monday, January 27, 2020, 10:40 David WangCoolingMaintenance  ITE/ITW supply water presuure on dump circuits. With both stations in operation,ITE dump
supply gauge reading is 27 psi. ITW is 20
Psi.  I adjusted ITW dump pressure to
  
  2299   Tuesday, January 25, 2022, 08:57 David WangITE/ITWStandard Operation  ITE/ITW have been cleaned with vacuum canister. ITE/ITW  are cleaned with vacuum canister.
HV  cage inside and blue nylon insulators
are wiped.  Garbage inside the pits
  
  1869   Friday, February 15, 2019, 12:09 David WangITEMaintenanceTM4 ITE water system maintenance.The ITE water system maintenance job is
done. Changed all paddle wheels and coils
on ITE flow sensors. All using water poly-tubes
  
  2225   Wednesday, June 09, 2021, 10:15 David WangITE/ITWStandard OperationTM4UCX33. ITE water signal interlock check. Annual ITE water signal interlock check
is done.  HS, TAR, TUBE, MSP, EE, COIL
1, containment box window, HVC1, HVC2, 2A
  
  1932   Tuesday, June 04, 2019, 08:46 David WangITEStandard OperationTM2 ITE water signal interlock check.ITE water signal interlock check is done.
Everything is good. Coil 2   circuit
no longer used in ITE . PQRU are looped as
  
  2459   Wednesday, June 14, 2023, 13:37 David WangITEStandard OperationTM4 ITE water signal interlock checkITE water signal interlock check including
HS,EE, TA, TU, MSP. Coil1 , C-window ,2a-window,
2A tank, 2A shielding plug , 2A dump, 2A
  
  2046   Friday, January 10, 2020, 10:26 David WangITEStandard Operation  ITE water signal inerlock check.ITE water  signal interlock  
check is done.  Everything is good.
It is a annual check we do in winter shut
  
  2590   Monday, May 13, 2024, 09:28 David WangITEStandard OperationTM4UCx#44ITE water signal annual interlock check.ITE water signal annual interlock check
is done. Ed helped me on this check. Everything
works normal. 
  
  1548   Tuesday, May 23, 2017, 14:10 David WangITEStandard Operation  ITE water interlock check is done.We do this check once a year now. Rene
found a target oven reset issue during the
check . He will consult with Friedhelm. The
  
  2198   Thursday, March 11, 2021, 11:42 Frank SongITEMaintenance  ITE water flow wheels and coils replacement. ITE water flow wheels
and coils are replaced. Wheels and coils
  
  613   Thursday, March 06, 2014, 06:58 David WangITEMaintenanceTM3 ITE vacuum and leak check on ITE BL2A window flange.ITE and TM3 Turbo pumps have been started
successfully yesterday. The vacuum reading
on all ITE high vacuum gauges are at low
  
  2088   Tuesday, March 17, 2020, 14:59 David WangITEDevelopmentTM4P2NITE turbopumps are started.They work fine. Current draw on all pumps
are normal. I asked operator to switch on
IG1 , IG1S and PNG4. 
  
  2113   Monday, June 29, 2020, 10:09 David WangITEStandard OperationTM4P2N test.ITE turbo pumps are stoppedITE venting is in processing.   
  655   Monday, May 05, 2014, 13:05 David WangITERepairTM3 ITE target module flange seal has been replaced.ITE target module flange seal has been
replaced.The flan surface and the o-ring
groove have been cleaned with Acetone before
 004.JPG008.JPG008.JPG007.JPG 
  1479   Wednesday, April 05, 2017, 11:57 David WangITEMaintenance  ITE target module flange o-ring repalcementITE target module tank flange o-ring was
replaced yesterday before TM4 moving. ITE:
IG1S reading looks fine so far. 
  
  2237   Friday, July 30, 2021, 16:31 Carla BabcockITERepair  ITE re-wireSee the attached for the way ITE has been
re-wired for the Ta62 run. Note also that
the copper block in the schematic on TBHT
 ISK4425D-rev9._APshortmitigationsvg_july27update.png 