  663   Wednesday, May 21, 2014, 13:56 Travis CaveSpent Target VaultStandard Operation  Spent target assayAll targets in the vault have been assayed
and measured. Results will be posted soon.
 Vault_Storage_May_22_2014.pdf 
  664   Tuesday, May 27, 2014, 09:38 maicodallavalleSpent Target VaultMaintenance F-308 Maintenance F-308 MaintenanceAll the F-308's can back from being certified
at Nordion.  All of the F-308's have
been serviced and are ready to be filled
  
  665   Tuesday, May 27, 2014, 09:42 maicodallavalleSpent Target VaultMaintenance  F-308 MaintenanceAll of the serviced F-308's have been moved
to the South Hot cell area.
  
  669   Friday, May 30, 2014, 09:41 Travis CaveSpent Target VaultStandard Operation Ta#42Spent target moveTa#42 in pail #114 has been moved from
the south hot cell to the spent target storage
vault and place in spot 7B. The target was
 Vault_Storage_May_30_2014.pdf 
  681   Thursday, June 12, 2014, 09:42 Travis CaveSpent Target VaultStandard Operation  Targets moved from mini storage to F-308sFive targets have been moved from the spent
target storage to the mini storage. The targets
that were moved are UCx #'s 6,7,8 , SiC #28,
 Vault_Storage_June_12_2014.pdfMini_Vault_Storage_June_12_2014.pdf 
  685   Tuesday, June 24, 2014, 11:33 maicodallavalleSpent Target VaultStandard Operation  F-308 MaintenanceFive F - 308 flasks containing five ISAC
spent targets were moved from the anteroom
into the south hot cell area. When the F
  
  698   Wednesday, July 02, 2014, 14:29 David WangITEStandard Operation  Reconnected TM3 in ITE.I reconnected TM3 in ITE. All turbo pumps
have been started. The water supply to TM3
only in ITE. The HV keys are back to electrical
  
  718   Monday, July 28, 2014, 17:26 Ron KuramotoITWRepair  ITW:IV5 Air leak repairAir leak
was found at the Solenoid control valve located
in the Pre-Separator & DB0 room.  The
 DSCN0087.JPG20140728_142855_-_small.jpg20140728_143202_-_small.jpg 
  719   Wednesday, July 30, 2014, 11:51 Travis CaveConditioning StationMaintenance  entrance module moveITE Entrance module has been moved from
the east station to the conditioning station.
  
  721   Tuesday, August 05, 2014, 10:40 Travis CaveITEStandard Operation  module moveITE Entrance module has been moved back
to the east station.
  
  722   Tuesday, August 05, 2014, 11:53 David WangITERepair  Reconnected ITE entrance moduleITE entrance module is reconnected in ITE.   
  724   Wednesday, August 06, 2014, 11:12 Travis CaveSouth Hot-CellStandard Operation SiC#30Spent target moveSiC#30 in pail #117 has been move to the
spent target vault and placed in spot 2C.
See attached PDF for details.
 Vault_Storage_August_6_2014.pdf 
  742   Friday, September 05, 2014, 13:07 Travis CaveSpent Target VaultStandard Operation Ta#43Spent target moveTa#43 has been moved from the south hot
cell to the spent target vault. See attached
PDF for details.
 Vault_Storage_September_5_2014.pdf 
  747   Friday, September 12, 2014, 14:21 Travis CaveSpent Target VaultStandard Operation  Spent target field measurementsFive of the ten target we want to measure
the fields on were done today. We will finish
up on Monday, and the spent target storage
  
  748   Monday, September 15, 2014, 11:23 Travis CaveSpent Target VaultStandard Operation  Spent target field measurementsField measurements on the spent target
has finished see the attached PDF for details.
 Vault_Storage_September_15_2014.pdf 
  757   Friday, September 26, 2014, 10:56 Travis CaveSpent Target VaultStandard Operation UC#10Spent target moveUC#10 has been moved from the south hot
cell to the spent target vault. It was placed
in Pail #119 and in slot 8B. For further
 Vault_Storage_September_26_2014.pdf 
  766   Thursday, October 16, 2014, 15:40 Anders MjosConditioning StationMaintenance  Chiller unitNOTE: If there is a problem with
the chiller unit (ie Fault 1 or Fault 2),
a power cycle may reset the VFDs for the
 TCS_Cooling_System.pdf 
  767   Friday, October 17, 2014, 13:36 Anders MjosConditioning StationMaintenance  TCS:Chil staging not operationalNOTE: If cooling is required, the
compressors will have to be run manually.
Make sure to switch it off again when the
  
  770   Monday, October 20, 2014, 14:18 chad fisherSouth Hot-CellRepair  Manipulator RepairThe broken cable on the east manipulator
has been replaced.
The handle will need some adjustments
  
  771   Tuesday, October 21, 2014, 08:55 chad fisherSouth Hot-CellRepair  Manipulator repairThe east manipulator handle has been adjusted
and is ready for use.
  