ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  2522   Friday, January 12, 2024, 10:53 David WangSouth Hot-CellStandard Operation  ITW entrance module has been moved from ITW to SHC. ITW entrance module has been moved from
ITW to SHC. The move is smooth.  I cleaned
entrance module tank flange and o r-ing slot. 
  
  2521   Thursday, January 11, 2024, 13:57 David WangITWStandard Operation  ITW entrance module has been disconnect.ITW entrance module has been disconnected
per document190510. It will be moved to SHC
for diagnostic group tomorrow. 
  
  1920   Monday, May 13, 2019, 11:22 David WangITWRepair  ITW entrance module has been connnected.Entrance module has been connected back
to ITW. Everything is normal.
  
  2544   Thursday, February 15, 2024, 13:52 David WangITWStandard Operation  ITW entrance module and exit 1 module leak check after module move and tank flange orings replacement. ITW entrance module and exit 1 module
leak check on module service cap/top air
to vacuum seals and module to tank flange 
  
  1434   Tuesday, February 07, 2017, 10:34 David WangITWMaintenance  ITW clean upITW has been cleaned up today.  All
station are vacuum cleaned. I wiped all HV
cover and HV area including conductors and
  
  2581   Thursday, May 02, 2024, 18:48 Carla BabcockITWStandard Operation  ITW cage setupITW gas lines pumped down to 2e-3Torr on
leak detector with leak rate in the low e-7
atm-cc/s. Gas bottles opened at 3psi and
  
  2182   Monday, January 25, 2021, 12:33 David WangITWStandard Operation  ITW bias HV testRamp up ITW bias to 57KV. no spark. 200uA
leaking current at 57KV. The test is done
without target module in station.  
  
  1703   Friday, April 20, 2018, 15:33 Keith C NgITWRepair  ITW beam tube repair job2A2 window has been removed from ITW and
beamlines has removed the beamtube from the
penetration. The penetration has been sealed
 20180420_2a2beamtuberepair_P1040034.JPG20180420_2a2beamtuberepair_P1040030.JPG20180420_2a2beamtuberepair_P1040029.JPG20180420_2a2beamtuberepair_P1040036.JPG 
  1704   Friday, April 27, 2018, 15:06 Keith C NgITWRepair  ITW beam tube repairVacuumed out remainder of debris from the
wall penetration, removed cradle and checked
condition. Down stream support bracket sees
 6x 
  1984   Thursday, September 12, 2019, 09:26 David WangITWRepairTM4 ITW bad vacuum issue and trouble shoot.ITW secondary vacuum was bad in last two
days after TM4 was connected in ITW. Today
when check the exit 2 module, I found a small
  
  2541   Monday, February 12, 2024, 18:44 Carla BabcockITWMaintenance  ITW annual HV testingITW was set up for HV testing - water is
running and at a high resistivity due to
injected N. Einzel lens is attached to ground.
 Screenshot_from_2024-02-12_18-44-03.png 
  72   Wednesday, February 01, 2012, 09:54 David WangITWMaintenanceTM1 ITW and TM1 winter shut down vacuum leak checkITW and TM1 winter shut down vacuum leak
check had been finished yesterday.All ITW
primary vacuum vessel, secondary vacuum vessel,
  
  2100   Thursday, June 11, 2020, 11:49 David WangITEMaintenance  ITW and ITE thermocouple status.     
  2187   Friday, February 12, 2021, 07:07 David WangITEMaintenance  ITW and ITE clean up.Vacuum cleaned ITW and ITE station. 
  
  1697   Monday, April 09, 2018, 06:36 David WangITWStandard Operation  ITW Turbo -pumps switch offI asked MCR to switch off ITW TP3,4 TP1s,2s
this morning.
  
  2056   Monday, February 03, 2020, 09:10 David WangITWStandard OperationTM4 ITW TPs are switched off. started of ITW argon venting.ITW is argon venting now.
Argon venting of ITW is done. It
took about 4.0 to 4.5 hours to vent the ITW
  
  159   Tuesday, August 07, 2012, 14:06 David WangITWRepair  ITW TP4S has been replaced
 

 Normal
  0

 
   
  
  2112   Friday, June 26, 2020, 15:00 David WangITWMaintenance  ITW TP1 and TP1S.ITW TP1 can not be started yesterday. Also,
TP1S was difficult to start , and had a high
current draw after.  We changed both
  
  1808   Tuesday, October 23, 2018, 11:32 David WangSouth Hot-CellMaintenance  ITW RV4S leak check.ITW RV4S (A and B) are leak checked. They
are good.  
  
  2303   Thursday, February 10, 2022, 12:24 David WangITWStandard Operation  ITW HV test without mdoule.   Carla did the test. and reported
the result as following: HV testing of ITW
is complete. It was pretty well behaved up
  